K I T 2 3 : T H E R I G H T R I B S A N D T H E L E G ( I I I )
4
5
20-3
15-1
16-1
18-1
23-5
20-3
15-1
16-1
21-1
23-5
23-5
23-5
23-5
17-1
21-1
23-4
4-1
4-2
Take time to make sure that
all of the parts are correctly
aligned and fix firmly
together with ten 2.3x6mm
screws
23-5
.
Next take the second tibia assembly
4-1/4-2/17-1/18-1
which was worked
on in pack 3 - kit 18. Fit the Ball Joint
23-4
into the slot at the end of part
4-1
and
18-1
. Check the orientation to
ensure a good fit. This assembly is now
covered with the other half of the tibia
15-1/16-1/20-3/21-1
. There are
raised screw sockets on the assembly
4-1
which fit into matching recesses on
assembly
16-1
.
3