Figure 2 Installation in-line
1
D1
2
D2
Installation off-line
Place the sensor in a flow chamber and connect the flow chamber to the "OUT" port on the
instrument using a small piece of plastic tubing. The sample is evacuated through tubing attached
the outlet port on the flow chamber.
A flow rate exceeding 20 L/hour (ideally 60 L/hour) is required. After opening the sample valve, wait
at least 30 minutes to ensure all parts in contact with the sample have been well rinsed and that the
optimal thermal equilibrium between the sample, flow chamber and conductivity sensor has been
reached.
English
11
Summary of Contents for Polymetron 9526
Page 130: ...1 2 3 4 5 2 DN8 DN6 DN6 2 IN OUT 100 s cm CO2 1 2 S cm KCI 10 S cm 130...
Page 134: ...3 0 35 2 mm2 AWG 22 14 105 4 7 1 131 4 1 5 9 2 6 10 3 7 4 8 1 6 4 6 2 1 4 134...
Page 136: ...5 1 5 Back 2 6 Menu Settings Menu 3 HOME Main Measurement 7 4 ENTER SD 6 136...
Page 206: ...EMC 206...
Page 207: ...EMC A A IECS 003 A FCC 15 15 FCC 1 2 15 FCC 1 2 3 4 5 207...
Page 208: ...2 DN8 DN6 DN6 2 100 CO2 1 2 10 KCl 208...
Page 212: ...30 2 1 D1 2 D2 OUT 20 60 30 212...
Page 213: ...3 0 35 2 2 AWG 22 14 105 C 4 7 1 209 213...
Page 215: ...Startup 203 1 2 3 4 5 5 5 1 5 BACK 2 SD 6 MENU 3 HOME 7 4 ENTER SD 215...
Page 245: ......