63
5.6
Wiring the Meter
WARNING
Wiring connected in this
box must be rated at least
300Vrms/600Vpk.
ADVERTENCIA
Los cables de senalizacion conectados a esta caja deben tener una clasificacion de por lo menos
300Vrms/600Vpk.
ADVISO
A hacao dw sinal conectada nesta caixa deve ter classificaco de pelo menos 300Vrms/600Vpk.
ATTENTION
Le câblage de signalisation raccorde dans ce boîtier doit convenir pour une tension nominale
d'au moins 300Vrms/600Vpk.
WARNHINWEIS
Die diesem kasten angeschlossene signal verdrahtung mub nit mindestens 300Vrms/600Vpk
bemessen sein.
The meter wires are routed through three ½-inch conduit fittings located on the back of the
meter (see Figure 17). The left conduit hole (as viewed from the front of the meter) is for
alarm connections, the center conduit hole is for power connections and the right conduit
hole is for electrode, recorder, controller, and SIO connections. The left and right conduit
holes have molded-in knockouts, which must be removed if used. To maintain the NEMA
4X and IP66 ratings of the enclosure, the conduit fitting (not supplied) must be a sealing
type. To make the wire connections refer to Section 5.6.1 Wire Preparation. Remove the
front panel of the meter by removing the four corner screws. Disconnect the existing wires
from the front panel by unplugging the connector(s) (see Figure 18 on page 64).
Remove the wire shield. Unplug the connector from the circuit board on the front panel,
and hook up the wires. Replace the wire shield, routing the wires through the notches, and
verifying that the shield wire stays under the wire shield. Plug the connectors into the
circuit board, and replace the front panel of the meter.
Figure 17
Controller Inside Back Cover
Summary of Contents for EC1000
Page 2: ...2...
Page 8: ...8...
Page 12: ...12...
Page 14: ...14...
Page 16: ...16...
Page 18: ...18 Figure 1 Controller Front Panel...
Page 20: ...20 Figure 2 Pump Module...
Page 24: ...24 Figure 6 pH Control Loop...
Page 54: ...54...
Page 56: ...56...
Page 58: ...58 Figure 12 Controller Installation Panel Mount...
Page 61: ...61 Figure 15 Installing the pH ORP Electrode Figure 16 Flow Thru Cell...
Page 70: ...70...
Page 73: ...73 6 4 Calibration See Section 2 3 Calibration Figure 21 Priming Tee Operation...
Page 74: ...74...
Page 80: ...80...
Page 83: ...83 Figure 24 Sensor Replacement...
Page 85: ...85 Figure 25 Hach One pH Process Electrode...
Page 89: ...89 Figure 26 Pump Module Plumbing Diagram...
Page 102: ...102...
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 108: ...108...
Page 112: ...112...
Page 116: ...116...
Page 122: ...122...
Page 123: ...123...
Page 124: ......