![Hach A1000 Basic User Manual Download Page 10](http://html1.mh-extra.com/html/hach/a1000/a1000_basic-user-manual_3187454010.webp)
Install the analyzer and controller:
• In a clean, dry, well ventilated, temperature controlled location with
minimum vibration that does not receive direct exposure to sunlight.
Install the analyzer so that:
• It is upright and level.
• There is sufficient clearance around it to make plumbing and electrical
connections.
• There is sufficient clearance around it to remove the two end covers.
• The power cord and power button are visible and easily accessible.
• There is no air flow restriction through the air filters.
• The air filters do not get wet.
• It is as near the sample source as possible to decrease analysis
delay.
Mechanical installation
C80 controller mounting
Install the controller in a flat, stable, vertical panel. Make sure that the
top surface of the controller is level. Cut an opening in the panel at eye
level. Refer to
for dimensions and mounting.
Figure 6 C80 controller mounting
Analyzer mounting (A1000 S10 and A1000XP-S models)
Attach the analyzer to a flat, stable, vertical surface. Refer to the
illustrated steps in
. Make sure that the top surface of the
analyzer is level.
Mounting hardware is supplied by the user. Refer to
for the
minimum clearances.
10
English
Summary of Contents for A1000
Page 2: ...English 3 Deutsch 29 Italiano 57 Fran ais 83 Espa ol 110 2...
Page 28: ...28 English...
Page 56: ...56 Deutsch...
Page 82: ...82 Italiano...
Page 109: ...Fran ais 109...
Page 136: ...136 Espa ol...
Page 137: ......