![Hach 2100N Instruction Manual Download Page 54](http://html2.mh-extra.com/html/hach/2100n/2100n_instruction-manual_3147801054.webp)
54
SECTION 5,
continued
5.2.1.1
Assembling The Support Stand
1. Verify the sample compartment is empty, and turn the instrument off.
2. Turn the instrument on its top (place it on a soft cloth to protect the instrument
from marring), and install the base plate of the stand as illustrated in
Figure 12. Do not over tighten the screws.
3. Place the instrument right side up.
4. Install the Flow-Cell Inlet Reservoir on to the support rod.
5. Slide the Collection Drain Assembly on to the support rod.
6. Place the instrument right-side up, and install the support rod into the base.
5.2.1.2
Assembling The Flow Cell
Verify the O-rings have been installed in the top and bottom end caps; then screw
the caps onto the glass sample cell. Tighten the caps enough to ensure a water-
tight seal, but do not over tighten.
Figure 12
Base Plate Installation
Tài liệu sưu tầm của Trung Sơn - www.tschem.com.vn - 028.3811.9991 - [email protected]