background image

Page 2

Series 77 & 78 Installation, Operating & Maintenance

2. SIL

Under  normal  operating  conditions  the  Habonim  valve  should  be 
inspected  for  proper  functioning  and  signs  of  deterioration  every 
50,000 cycles or 6 months (whichever comes first). Under severe 
operating conditions inspection should be more frequently; detected 
defects should be repaired promptly.
Severe operating conditions can be defined as:

• 

Application temperature less than -20 deg C

• 

Application temperature higher than +230 deg C

• 

Flow velocity higher than 5 m/sec for liquids, and 200 m/sec 
for gaseous

• 

Acidic media PH < 5 or alkaline media PH > 9

Habonim recommend a proof test interval of 12 months; in case of 
Fail to Open ESD system, a partial stroke is acceptable to confirm 
that the installation is functioning properly.
For ESD systems with a Fail-To-Close demand, it is necessary to 
plan a system shut-down; de-energize the system and inspect the 
valve turning to its fully closed position.
It is essential to log-in the following parameters on site QA records 
as  a  proof  for  preserving  SIL  capabilities:  date,  hour,  name  and 
signature of the responsible engineer, air pressure on site, time to 
close the valve, time to open the valve. 
Habonim recommend valve full maintenance operation every 500,000 
cycles or 4 years, whichever comes first (refer to Para. 7 in this IOM 
for  maintenance  instructions).  The  combined  corrosion  and  erosion 
allowance for the valve body wall thickness is 1 mm. When this allowance 
has been eroded or corroded, mechanically removed or otherwise, the 
valve should no longer be used. Inspect the valve wall thickness every 
time the valve is maintained. Refer to Habonim Corrosion Data Chart 
T-614 to determine the corrosion rate for your application. 
The  estimated  mean  time  to  repair  (MTTR)  a  valve,  i.e.  time  net 
(line draining or cooling down time excluded from the valve MTTR) 
of replacing old valve with a new one is 60 minutes. Maintenance 
team must read and understand the Habonim product IOM before 
starting the operation. In case of a doubt please consult the Habonim 
engineering team.
When a valve has been repaired or any maintenance was performed, 
check  the  valve  for  proper  function  (proof  testing).  Any  failures 
affecting functional safety should be reported to the Habonim factory.
Client  should  consult  the  Habonim  factory  in  order  to  obtain  the 
product assessment, FMEDA report, and other associated statistical 
data to satisfy SIL level. 

3. LIMITATIONS

The correct selection of materials of construction, seats and seals, 
internal  valve  components  and  pressure/temperature  ratings 
determines the safe use of the valves and the particular performance 
requirements for the application. This information can be found on 
the nameplate welded to the valve body. 
It is not possible to cover all installation and maintenance instructions 
for  service  of  the  valves,  as  the  extent  of  applications  that  these 
valves can be used in, is large. It is the user’s responsibility to use 
the valves as recommended and in accordance with the pressure 
and temperature limits as stated on this tag. Where in doubt, please 

consult with Habonim engineering team.  
Unstable fluids or gases are prohibited for use in Habonim valves.

CAUTION:

The valves should be used in a well designed, adequately protected 
system  to 

ensure  that  external  and  internal  pressure  and 

temperature limits do not exceed the valve limits.

 

The valve rating is defined as the lower rating of the seat and valve body. 
Valve surface temperature may become extremely hot or cold due 
to operating conditions. Prevent any type of direct contact with the 
valve that may cause harm or injury .Avoid direct contact with the 
valve by wearing protective gloves.
The valves should be used in a well designed, adequately supported 
piping  system  such  that  it  will  not  be  subjected  to  undue  forces, 
stresses or shock loads during service.
The valves are not designed to operate during or after earthquakes 
or under fatigue conditions. It is the responsibility of the owner to 
determine if fatigue conditions exist.

Do not allow dust layers to build up on the equipment.
The  process  fluid  temperature  shall  not  exceed  the  ignition 
temperature of the dust.

4. STORAGE 

Prior to storage, inspect the valve for shipping damage. Keep all 
protective packaging, flange covers and end caps attached to the 
valves during storage. It is recommended to keep the valves in a 
clean and dry environment until ready for use.
Carbon Steel valves have a “black oxide” and oil dipped finish. This 
nontoxic process is performed to retard rusting during storage. It is 
not a substitute for paint or other means of protective coating to be 
applied to the valve once installed. 
Stainless steel valves have their natural finish and do not require 
additional protection once installed.
  

5. OPERATING INSTRUCTIONS 

Habonim  Valves  provide  tight  shut  off  when  used  under  normal 
conditions and in accordance with Habonim’s published pressure/
temperature  chart.  If  these  valves  are  used  in  a  partially  open 
(throttled) position, seat life may be reduced. Consult with Habonim 
for the proper seat material selection.
On manual operated valves, the valve operation is done by turning 
the valve handle 90°. A 90° turn counter clockwise is for opening, 
while  90°  turn  clockwise  is  for  closing  the  valve.  On  manual 
operated valves, the open position is when the stem flats or handle 
are parallel with the pipeline, and the closed position is when handle 
or stem flats are perpendicular to the pipeline. On valves above 2”, 
the indication is by a groove on the square headed shaft.
All standard valves are bidirectional and as such, can be installed 
for flow in either direction. Valves which are unidirectional will have 
a flow direction arrow welded to the body and separate assembly 
instructions.
A silicone-based lubricant is applied to assist valve break in. The 
lubricant, if unacceptable, may be removed by a solvent wash.
If  a  shut-off  valve  is  installed  for  end  of  line  service,  it  must  be 
ensured that it is closed with a blind end connection and the valve is 

Summary of Contents for 77 Series

Page 1: ...caution must be taken when handling a valve that has toxic corrosive flammable or a contaminant nature media flowing through its pipeline The following safety precautions are recommended when dismantl...

Page 2: ...arge It is the user s responsibility to use the valves as recommended and in accordance with the pressure and temperature limits as stated on this tag Where in doubt please consult with Habonim engine...

Page 3: ...tached to the valve 6 1 7 Before installation check to insure that the ball is in the fully open position in order to prevent possible damage to the ball and seats The valve performance depends on its...

Page 4: ...en the handle nut while holding the handle 9 8 close the body plug hand tight until it fully stopped 9 9 mark a straight line that cross the plug and the valve flange facing 9 10 In the next steps the...

Page 5: ...Tighten the handle nut while holding the handle 11 8 Bring the handle to the closed position to insert the ball 11 9 Place the ball in the body center section until the stem tongue is engaged and turn...

Page 6: ...200 BODY BALL SEAT PRES SIZE Habonim logo Body material Seat material Valve size Valve description Ball material Work order Max pressure BODY DN 0086 BALL P O SEAT YR BAR BAR C C INDUSTRIAL VALVES LTD...

Page 7: ...m the valve cavity Keep the valve in the open position and remove all but one body bolt so the valve body can swing away from its installed position and be brought out of the pipe line In this positio...

Page 8: ...494 M35 1 ASTM A351 CK3MCuN ASTM A351 CD4MCU ASTM A995 UNS J93388 1 4 Stem G X6CrNiMo 18 10 1 4408 S St ASTM A351 CF8M C St A216 WCB ASTM A494 CW12MW ASTM B574 ASTM A351 CN7M ASTM A494 M35 1 ASTM A351...

Page 9: ...MW ASTM B574 ASTM A351 CN7M ASTM A494 M35 1 ASTM A351 CK3MCuN ASTM A351 CD4MCU ASTM A995 UNS J93388 1 4 Stem G X6CrNiMo 18 10 1 4408 S St ASTM A351 CF8M C St A216 WCB ASTM A494 CW12MW ASTM B574 ASTM A...

Reviews: