background image

 

Mounting the AP on a ceiling 

 

CAUTION: 

The ceiling for installing the AP must be less than 18 mm (0.71 in) in thickness, and can bear a load 
of 5 kg (11.02 lb). If the ceiling is not strong enough, use boards to reinforce the ceiling as a best 
practice. 

 

To mount the AP on a ceiling: 

1. 

Set the alignment pegs on the AP bracket into the alignment holes in the AP rear. Use the M4 
× 7 screw to secure the AP bracket to the AP through the installation hole in the middle of the 
AP bracket. 

2. 

Mark the installation holes on the ceiling by using the wall/ceiling bracket. 

3. 

Drill two holes with a diameter of 5 mm (0.20 in) in the marked positions, as shown in 

Figure 

12

Figure 12 Drilling holes in the ceiling 

 

 

4. 

Thread the pan-head screws through the installation holes in the wall/ceiling bracket and into 
holes in the ceiling. Fasten washers and nuts at the other side of the ceiling to attach the 
wall/ceiling bracket to the ceiling, as shown in 

Figure 13

Figure 13 Attaching the wall/ceiling bracket to the ceiling 

 

 

Summary of Contents for WA530

Page 1: ...ting the AP on a wall 4 Mounting the AP on a ceiling 7 Connecting the AP to the power source 8 Check before power on 8 Connecting the PoE power supply 8 Connecting the local power supply 9 PoE injecto...

Page 2: ...ion Take adequate safety measures to avoid body injury and device damage Place the AP in a dry and flat location and take anti slip measures Keep the AP clean and dust free Do not place the AP in a mo...

Page 3: ...2 Installation tools When installing the AP you might need the following tools Prepare the installation tools as required Figure 2 Installation tools...

Page 4: ...termining the installation position Determine the installation position by observing the following principles Few obstacles such as wall exist between the AP and clients The AP is far away from electr...

Page 5: ...ng attach the AP bracket to the AP and the wall ceiling bracket to the wall or ceiling Figure 4 Mounting bracket kit 1 AP bracket 2 Alignment peg 3 Wall Ceiling bracket 4 Installation hole Figure 5 Wa...

Page 6: ...ure 7 Marking installation holes on the wall 3 Drill holes with a diameter of 6 mm 0 24 in and a depth of 30 mm 1 18 in in the marked locations as shown in Figure 8 Figure 8 Drilling holes in the wall...

Page 7: ...he screw anchors Adjust the position of the wall ceiling bracket and fasten the screws Figure 10 Attaching the wall ceiling bracket to the wall 6 Align the two tabs on the AP bracket into the notches...

Page 8: ...ket to the AP through the installation hole in the middle of the AP bracket 2 Mark the installation holes on the ceiling by using the wall ceiling bracket 3 Drill two holes with a diameter of 5 mm 0 2...

Page 9: ...efore powering on the AP To power the AP with local power make sure the local power supply is reliably grounded To power the AP through PoE make sure the PoE power supply PSE is reliably grounded To p...

Page 10: ...er port of the AP to the local power source Connect the power adapter to the AP as shown in Figure 16 Figure 16 Connecting the local power supply PoE injector power supply CAUTION A PoE injector must...

Page 11: ...less client with the AP and verify that the client can access resources in the external network For a fit AP execute the display wlan ap all command on the AC and verify that the AP status is R M Sysn...

Page 12: ...11 C Config DC DataCheck R Run M Master B Backup AP name APID State Model Serial ID ap1 1 R M WA530 219801A1NR8182031202...

Page 13: ...s enter the username and password and then lick Login The default username and password are admin and h3capadmin respectively Figure 18 Login page Accessing the cloud AP from the Oasis platform By def...

Page 14: ...13 Figure 19 Oasis Manager QR code 2 Add the AP to the Oasis platform For more information see the H3C Oasis Platform Deployment Guide...

Page 15: ...ure 20 Fit AP networking Figure 21 Cloud AP networking Table 3 Technical specifications Item Specifications Protocol IEEE 802 11a b g n ac Wave2 Radio Two Built in antenna 2 4 G antenna 3 84 dBi peak...

Page 16: ...description Port Standards and protocols Description Console port RS EIA 232 The console port is used for device configuration and management GE1 PoE IEEE802 3 IEEE802 3u IEEE802 3af The port acts as...

Page 17: ...at 1 GHz Only the 5G radio has associated clients Alternating between green and blue at 1 Hz Both the 2 4G and 5G radios have associated clients Table 6 LED description cloud AP mode LED Status Descri...

Reviews: