3
Installing the AP
Figure 1 Installation flowchart
Check before installation
Before installing an AP, perform the following tasks:
•
Connect the AP to the power supply and the network. Examine the LEDs to verify that the AP
can operate correctly. For more information about AP LEDs, see "
."
•
Record the AP MAC address and serial number marked on the rear of the AP for future use.
Installing the AP
Attaching the mounting bracket to an electrical outlet box
As shown in
, use the M4 screws to attach the mounting bracket to an electrical outlet box.