
48
Figure 57 Installing the flash card
9.
(Optional.) Install the supercapacitor. For more information, see "
."
10.
(Optional.) Connect the storage controller to the supercapacitor. Connect one end of the
supercapacitor extension cable to the supercapacitor cable and the other to the storage
controller. For more information about the connection, see "
Connecting the flash card and the
supercapacitor of the power fail safeguard module
."
CAUTION:
Make sure the extension cable is the correct one. For more information, see
.
11.
Connect drive data cables to the Mezzanine storage controller. For more information, see
"
."
12.
Install the removed riser cards in PCIe riser connector 1 and 2. For more information, see
"
Installing riser cards and PCIe modules
13.
Install the removed fan cage. For more information, see "
."
14.
Install the removed air baffles. For more information, see "
15.
Install the access panel. For more information, see "
16.
Rack-mount the server. For more information, see "
17.
Connect the power cord. For more information, see "
18.
Power on the server. For more information, see "
Verifying the installation
Log in to HDM to verify that the Mezzanine storage controller, flash card, and supercapacitor are
operating correctly. For more information, see HDM online help.
Installing a standard storage controller and a power fail
safeguard module
Procedure
1.
Power off the server. For more information, see "