7
Power supply
•
Make sure the power supply system at the installation site is stable and meets the requirements
of the power modules, including the rated input voltage.
•
Select power modules based on the power consumption of the cards and fan trays. For more
information about system power consumption and technical specifications of power modules,
see "
" and "
."
Installation accessories
Console cable
Grounding cable
ESD wrist strap
Cable tie
Mounting brackets
M6 screws
(provided with the
SR6608-DS and
user-supplied for
other router
models)
Cage nuts
(provided with the
SR6608-DS and
user-supplied for
other router
models)
Checklist before installation
Table 8 Checklist before installation
Item Requirements
Result
Installation
site
Ventilation
•
There is a minimum clearance of 100 mm (3.94 in)
around the inlet and outlet vents for heat dissipation of
the router chassis.
•
A ventilation system is available at the installation site.
Temperature
0°C to 45°C (32°F to 113°F).
Relative
humidity
10% to 95% (noncondensing).
Cleanliness
•
Dust
concentration
≤
3 × 104 particles/m
3
.
•
No dust on desk within three days.