background image

Installing and removing a fan tray 

风扇模块的安装与拆卸

Before installing the fan tray, make sure the airflow direction marked on the fan tray meets 

the ventilation requirement of the installation site. 

安装风扇模块前,请根据风扇模 块的风

向指示,确认气流方向和安装环境的通风要求一致。

The switch comes with the two fan tray slots empty. You must install two fan trays of the 

same model on the switch. Do not power on the switch when no or only one fan tray is 

installed.

交换机出厂时两个风扇插槽均为空,为保证设备的正常散热,用户必须安装两个

相同型号的风扇模块,否则禁止交换机上电运行。

If both fan trays fail when the switch is operating, finish replacing the fan trays within 2 

minutes.

交换机运行过程中,如果两个风扇模块均出现故障,则必须在

2

分钟内完成故障风

扇模块的更换。

If one fan tray fails when the switch is operating, replace the fan tray within 24 hours when 

the ambient temperature is below 27°C (80.6°F). Do not remove the failed fan tray before 

replacement. Replace the failed fan tray immediately when the ambient temperature is 

above 27°C (80.6°F).

交换机运行过程中,如果一个风扇模块出现故

障,则当环境温度不高于

27

℃时,必须在

24

小时内完成故障风扇模块的更换,且更换前必

须保持故障风扇模块在位;当环境温度高于

27

℃时, 请立即进行更换。

Install a filler panel to the empty power module slot to ensure good ventilation and prevent 

dust from entering the chassis.

若电源模块插槽没有安装电源模块,请及时安装假面板,

以保证设备的良好通风散热并防止灰尘进入交换机。

The S6800-32Q adopts the front-to-back airflow design. You can choose different fan 

trays to direct airflow from port side to power module side or from power module side to 

port side for different installation sites. 

S6800-32Q

采用前后风道设计,通过配置不同的风扇模块,可提供

端口侧到电源侧

电源侧到端口侧

两种气流方向,满足不同环境下的散热要求。

Airflow direction of the switch

交换机的风向设计

6

5

Uses the LSWM1HFANSC fan tray

采用

LSWM1HFANSC

风扇模块

Uses the LSWM1HFANSCB  fan tray

采用

LSWM1HFANSCB 

风扇模块

Install and remove a power module

电源模块的安装与拆卸

Install a power module

安装电源

Remove a power module

拆卸电源

Install and remove a fan tray

风扇模块的安装与拆卸

Install a fan tray

安装风扇

Remove a fan tray

拆卸风扇

Remove a filler panel

拆卸假面板

Install a filler panel

安装假面板

Install and remove a filler panel 

假面板的安装与拆卸

1

2

1

2

1

2

Summary of Contents for S6800-32Q

Page 1: ...装到19英寸机柜时 可以根据需要调整附件在交换机上的安装位置 The S6800 32Q provides a grounding sign at the primary grounding point but does not provide it at the auxiliary grounding point S6800 32Q主接地点标有接地标识 备用接地点 上无接地标识 The two grounding screws at the primary grounding point also apply to the auxiliary grounding point S6800 32Q主接地点上的两个接地螺钉同样适用于备用接地点 2 1 H3C S6800 32Q Switch Installation Quick Start 6W106 H3C S6800 32Q交换机 快速安...

Page 2: ... grounding cable before installing the switch to the rack 为了防止机箱安装到 机柜后无法安装接地线 因此请先将接地线安装到交换机的侧面接地点上 Install the cage nuts to the square holes of the rack 安装浮动螺母到机柜方 孔条上 Mount the switch to the rack two options 安装交换机到机柜 二选一 Connect the other end of the grounding cable to the grounding point on the rack 接地线另一端连接到机柜接地点 Near the power modules 挂耳在靠近电源侧安装位 Connect the other end of the grounding cable t...

Page 3: ...ely when the ambient temperature is above 27 C 80 6 F 交换机运行过程中 如果一个风扇模块出现故 障 则当环境温度不高于27 时 必须在24小时内完成故障风扇模块的更换 且更换前必 须保持故障风扇模块在位 当环境温度高于27 时 请立即进行更换 Install a filler panel to the empty power module slot to ensure good ventilation and prevent dust from entering the chassis 若电源模块插槽没有安装电源模块 请及时安装假面板 以保证设备的良好通风散热并防止灰尘进入交换机 The S6800 32Q adopts the front to back airflow design You can choose different ...

Page 4: ...the power cord The method for securing AC and DC power cords are the same The following figure uses the AC power cord as an example 使用可拆卸式扎带固定电源线 以防止电源线脱落 直流电源线和交流电源线的固定方式相 同 此处以交流电源线为例介绍电源线的固定过程 Before connecting the power cord connect the grounding cable and make sure the switch is reliably grounded 在连接电源线前 需先连接保护地线 保证交换机正确接地 Connect the power cord to the switch first and then to the power sourc...

Reviews: