
22
Figure 27 Connecting the power cord for a PSR75-12A power module (1)
Figure 28 Connecting the power cord for a PSR75-12A power module (2)
Verifying the installation
After you complete the installation, verify the following items:
•
There is enough space for heat dissipation around the switch, and the rack or workbench is
stable.
•
The grounding cable is securely connected.
•
The power source is as required by the switch.
•
The power cords are correctly connected.
•
If part of the network cable for a port is routed outdoors, verify that a network port lightning
protector is used for the port.
•
If a power line is routed from outdoors, verify that a surge protected power strip is used for the
switch.
1
2