19
Figure 12
Installing a cage nut
4.
Align the installation holes on the front end of a slide rail with the cage nuts on a front rack post,
and use screws to attach the slide rail to the front rack post.
uses the right slide rail as
example.
Figure 13
Attaching the right slide rail to the front right rack post
5.
Keep the slide rail horizontally and adjust its length until the installation holes on the rear end of the
slide rail touch the cage nuts on the rear rack post. Then use screws to attach the slide rail to the
rear rack post.
Insert a screw in each mounting hole of the slide rail to ensure its weight bearing capacity.
6.
Repeat steps 4 and 5 to install the other slide rail. Make sure the two slide rails are at the same
height so that the switch can be placed on them horizontally.
shows the installed slide
rails.
1
2
Summary of Contents for S12500-X
Page 35: ...26 Figure 20 Grounding the switch through the RTN wire of the DC power module...
Page 80: ...71 Figure 51 Replacing an LPU 1 1 Loosen the captive screw 2 Pull the ejector levers outward...
Page 138: ...129 Figure 75 CXP fiber cable 1 Connector 2 Pull latch 1 2...
Page 152: ...143 Figure 91 Cable routing from the left side for an S12510 X AC S12510 X DC switch...