background image

Installation Guidelines

and Operation of Anderson

Ratio:Feeder

®

Series J Plus Injectors

GETTING TECHNICAL ASSISTANCE

The H.E. Anderson Company

is dedicated to assisting our customers with installation

and use of our products. Our technical staff are available each weekday from 8:30 AM
to 4:30 PM central time. You may call us toll free at

1-800-331-9620

from anywhere in

the U.S.A. and Canada. If no one is available, we will promptly return your call. You may
also contact us via e-mail at

[email protected]

Before you call,

review this manual. You may find the answer to your question here.

But if not, reviewing the manual will help us to help you.

If you need an additional owners manual for

any

H.E. Anderson Company product,

please visit our website at

http://heanderson.com/manuals.php

UNPACKING

Please open and inspect
your package upon receipt.
Your package was packed
with great care and all the
necessary packing materials
to arrive to you undamaged.
If you do find an item that is
broken

or

damaged, you

must contact the delivering
carrier to report the claim.

Summary of Contents for Feeder J Plus

Page 1: ...ly return your call You may also contact us via e mail at info heanderson com Before you call review this manual You may find the answer to your question here But if not reviewing the manual will help us to help you If you need an additional owners manual for any H E Anderson Company product please visit our website at http heanderson com manuals php UNPACKING Please open and inspect your package ...

Page 2: ...erate by either air or water shown operating by air Piping layout may be altered to fit available space Some PVC plumbing items are not supplied with unit See page 3 J Plus controller 2 inch jet meter shown 2 high capacity pumpers pumping fertilizer Optional EC pH monitors Plumbed using sch 40 PVC pipe ...

Page 3: ...chemical e g acid Anderson high performance 8 gallon PVC blend tank w 2 socket fittings P N 07533 Suction manifold shown hard plumbed by user using PVC pipe PVC unions allow for easy installation and removal PVC Bushing 1 2 NPT boiler drain for taking water samples Optional floor stand P N 07541 Bypass valves isolate sensors for servicing J Plus Controller 2 Jet Meter Water supply for pilot valve ...

Page 4: ...ller before starting up your system Refer to the J Plus Controller manual IMPORTANT If you have not flushed out the system as described in section 2 1 you should do so now Never transfer the suction line of a feeder pumping a strong acid or alkali to a container of water This can generate dangerous heat which may destroy your pumper and plumbing Do not store chemicals in tanks where the level will...

Page 5: ...fety equipment such as goggles gloves aprons or anything common sense tells you you might need Store protective clothing and accessories in a location away from the injector so that they may be donned before approaching the equipment Check with the manufacturer of the chemical for safety precautions for specific chemicals Label chemicals and keep a supply of antidotes neutralizing agents and safet...

Page 6: ...he pumpers Do not connect the supply line to the pilot valve manifold before flushing the system Make wiring connections after plumbing is complete Refer to the installation photos and drawings in the rear of this manual for information in assembling your system If you are unfamiliar with plumbing or working with the piping materials of your choice you should hire a professional plumber to do the ...

Page 7: ...enance There is no reason to disturb these components except to service them when a problem arises See the pumper manual for information on maintaining your pumpers and fittings The chemical concentrate solution should be kept clean and fresh When refilling the concentrate try to avoid stirring up sediment which may have collected on the bottom of the tank Your solution tank should be covered but ...

Page 8: ...some conditions which must be met in order for your injection system to operate properly These are given here Minimum line pressure of 30 psig measured on the downstream side of the injector If you do not have a pressure reading of 30 pounds at the pressure gauge on top of the unit then you do not have enough pressure If the water is flowing out to an open tank or onto the ground there will probab...

Page 9: ...red by H E Anderson Company in the manufacture of our products except to the extent of said component manufacturer s warranty This warranty specifically excludes liability for consequential damages or for charges for labor or expense in making repairs or adjustments or losses of time or inconvenience This warranty gives you specific legal rights and you may also have other legal rights which may v...

Reviews: