STEP 6
1.
Start With The Upper Cable 2330mm (52)
(a)
With
Upper Cable
(52) in groove of
Pulley
(31), thread
Upper Cable
(52) through brackets
on Upper
Cross Beam
(09).
(b) Install
Pulley
No.1 (31) to
Upper Cross Beam
(09) using one M10x45mm
Hex Bolt
(58),
two M10
Washers
(63) and one M10
Nylock Nut
(66).
(c)
Install
Pulley
No.2 (31) with two
Pulley Fastness Bush
(Big) (37) to
Main Frame
(03) using
one M10x65mm
Hex Bolt
(56), two M10
Washers
(63) and one M10
Nylock Nut
(66).
(d) Install
Pulley
No.3 (31) to
Upper Cross Beam
(09) using one M10x45mm
Hex Bolt
(58),
two M10
Washers
(63) and one MI0
Nylock Nut
(66). Attach the bolt end of
Upper Cable
(52) to
Selector Shaft
(07) using one
Plastic Washer
(68), attach the other end of
Upper
Cable
(52) to
High Pull
(14) using one
Pothook
(47).
(e)
Install
Pulley
No.4 (31) to
Reverse U
(17) using one M10x45mm
Hex Bolt
(58), two M10
Washers
(63) and one M10
Nylock Nut
(66).
2.
Assembly The Cable 2720mm (51)
(a)
Attach both end of
Cable
2720mm (51) to
Press Arm
(R) (10) and
Press Arm
(L) (11) using
two
Round Plug
(46).
(b) With
Cable
2720mm (51) in groove of
Pulley
(31) thread
Cable
(51) through brackets on
Main Frame
(03).
(c)
Install
Pulley
No.10 and No.12 (31) to
Volitant U
(19) using two M10x45mm
Hex Bolts
(58),
four M10
Washers
(63) and two M10
Nylock Nut
(66).
(d) Install
Pulley
No.11 (31) and
Pulley U
(18) using one M10x45mm
Hex Bolt
(58), two M10
Washers
(63) and one M10
Nylock Nut
(66).
3.
Assembly The Gable 3750mm (50)
(a)
With the
Cable
3750mm (50) in groove of
Pulley
(31) through
Leg Extension Frame
(05).
(b) Install
Pulley
No.5 (31) with two
Pulley Fastness Bush
(small) (38) to
Leg Extension
Frame
(05) using one M10x60mm
Hex Bolt
(57), two M10
Washers
(63) and one M10
Nylock Nut
(66).
(c)
Install
Pulley
No.6 (31) with two
Pulley Fastness Bush
(small) (38) to
Front Support
Frame
(04) using one M10x60mm
Hex Bolt
(57), two M10
Washers
(63) and one M10
Nylock Nut
(66).
(d) Install
Pulley
No.7 (31) with two
Pulley Fastness Bush
(Big) (37) to
Main Frame
(3) using
one M10x65mm
Hex Bolt
(56), two M10
Washers
(63) and one M10
Nylock Nut
(66).
(e)
Install
Pulley
No.8 (31) and
Pulley U
(18) using one M10x45mm
Hex Bolt
(58), two M10
Washers
(63) and one M10
Nylock Nut
(66).
(f)
Install
Pulley
No.9 (31) to
Front Base Frame
(01) using one M10x45mm
Hex Bolt
(58), two
M10
Washers
(63) and one M10
Nylock Nut
(66).
(g) Install
Pulley
No.13 (31) to
Reverse U
(17) using one M10x45mm
Hex Bolt
(58), two M10
Washers
(63) and one M10
Nylock Nut
(66). Attach the end of
Cable
3750mm (50) to
Front Base Frame
(01) using one
Pothook
(47), one
Chain
(53), one M8x40mm
Hex Bolt
(61), two M8
Washer
(64) and one M8
Nylock Nut
(67).
(h) Attach the
Low Pull
(13) or
Ankle Strap
(43) to the other end of
Cable
3750mm (50) using
two
Pothooks
(47) and one
Chain
(53).
NOW GO BACK OVER AND TIGHTEN ALL NUTS AND BOLTS.
EG
12
ASSEMBLY STEPS
Summary of Contents for HOME GYM2
Page 1: ...GYMSTICK HOME GYM OWNER S MANUAL ENGLISH 2 STR HG2...
Page 9: ...EG7 ASSEMBLY STEPS...
Page 11: ...EG9 ASSEMBLY STEPS...
Page 13: ...EG11 ASSEMBLY STEPS...
Page 15: ...EG13 ASSEMBLY STEPS...
Page 18: ...EG16 EXPLODED DRAWING...