8. Left Pneumatic
Arm x 1
9. Right Pneumatic
Arm x 1
11. MDF Slats x 2
A. 45mm M8 Bolt x 8
G. 5mm Allen Key x 1
A
A
A
A
G
Batch No.V1 - 12/17
Page 12 of 18
17. Bottom Panel x 2
STEP 7
PARTS REQUIRED
DAKOTA OTTOMAN BED ASSEMBLY INSTRUCTIONS
17
17
STEP 8
PARTS REQUIRED
4
5
9
11
8
9
X2