7
WaterDance Bubbler System
OPERATING INSTRUCTIONS
Please follow the procedure below to operate Gulfstream Inc’s
all-new WaterDance Bubbler System.
1. Operation:
a. Install the liner on the bowl
b. Hold the tab and peel off the white backing of the
AirPad – Take care not to touch the adhesive surface
c. Turn the AirPad so that the air tube is nearest to the
side of the footrest with the air outlet then place the
adhesive face down to stick the AirPad on top of the
liner, at the bottom of the bowl.
d. Apply uniform pressure across the top surface of the
AirPad to ensure proper adhesion between
the AirPad and the liner.
e. Take the included extension air tube and connect the
AirPad’s air tube to the extension tube’s end with the
soft connector by simply pushing each air tube’s end
until they meet in the centre of the connector.