6
©
Guldmann
G
B
-1
25
5/
08
/0
9
•
#
944120
©
Guldmann
G
B
-1
25
5/
08
/0
9
•
#
944120
©
Guldmann
G
B
-1
25
5/
08
/0
9
•
#
944120
©
Guldmann
G
B
-1
25
5/
08
/0
9
•
#
944120
1 .05
Assembling hoist before use
Assembling mast/chassis – electrical
Loosen screw fi tted to mast. Position mast in base.
When mast is in as far as it will go, tighten screw using
an M5 Allen key. To dismantle, remove screw to pull
mast out of base.
Assembling steering lever and mast/chassis
– manual
Adjust legs outwards. Position mast in base. When mast is in as far as it will
go, tighten the Allen screw. Bring the steering lever down over the steering
lever plate and tighten.
Mounting of connectors for motors and hand control
Fit connectors for width adjustment motor, actuator and hand control in the
mast.
Mounting of holder for hand control
Clean surfaces with the attached cleaning tissue. Remove the protective foil.
Stick the holder on to the mast or the lifting boom of the mobile hoist.
The holder is not ready to be used until after 3 days.
Fitting actuator
Fasten the actuator using the attached bushing and screw with nut.
Tighten screw and nut and put on the nut protector.
Batteries
The batteries supplied with the hoist are not fully charged on delivery. Before
use, therefore, the hoist must be charged up. A full charge, which takes about
8 hours, is recommended.
Fit lifting hanger to lifting boom as shown.
The hoist is now ready for use.
lifting hanger
Summary of Contents for GL2
Page 1: ...GB Guldmann mobile lifter Vers 2 00 ...
Page 19: ...19 ...