Installing a new GHZ lifting module in an existing rail system
Please notice when installing a GHZ in an existing rail system it must be
ensured that:
• The rated max load of the rail system, must be equal or higher than the max
load of the new hoist.
– If there is no max load mentioned on the rail system, the rail system must
then be checked according to the guideline in the installation manual
(distance between bracket according to max load).
– If the brackets are not visible, then a load test with 1,5 x max load of the
hoist must be performed minimum 20 min.
The deflection of the rails must not be higher than 1/200 of the length of
the rail.
– If it is not possible to do any of the above mentioned, please contact
Guldmann or their representative.
1.08
Installing / deinstalling GHZ in the rail
See the installation manual for GHZ.
1.09
Power supply
GHZ is equipped with a battery that requires regular recharging.
The power supply supplied must
always
be used.
Safety concerning static electricity (ESD)
Service technicians and installers
must
use an ESD-safety package
consisting of a mat, a ground wire, and a bracelet.
The technician/installer connects the mat to a grounding point, for instance a
radiator or a water pipe. The technician/installer must then put on the bracelet
and connect it to the mat. If it is not possible to find a grounding point, the
mat and the bracelet must be used as a minimum.
Only then is it allowed to work with the PC Board or components where it
is possible to come into contact with the PC Board.
Class II equipment
Mobile equipment is class II epuipment (marked with double-encassed
symbol ) and can be connected to the mains direct by the user.
Equipment is disconnected from Supply Mains by detaching the mains plug
from the wall outlet.