background image

Installation manual 

 

 
 

 

The final operation is the fitting of the floor beadings to cover the spaces between the floor boards and 
walls. If necessary, cut the floor beadings to the suitable length.  

ATTENTION

: Depending on the climate at the house location, the floor boards can either swell or 

diminish. If the floor boards are very dry while the climate is damp, they will easily absorb moisture. In 
this case, the floor boards should not be attached very densely to avoid likely bulging. Leave some 
space (1-2 mm) between the floor boards to allow for swelling. But if your climate is warm and dry, you 
can install the boards densely because they will become drier and spaces may appear between them.  

 

Storm braces 

(NB! Not included in some house option kits!) 

Attach the storm braces (if included in 
the supplied kit) to the inner sides of 
the front (2 units) and back (2 units) 
walls with the supplied bolts. It is 
important for the logs to be drilled 
through in advance. Please keep the 
distances indicated in the drawing so 
that no problems occur due to wood 
swelling or diminishing.  

ADVICE

: Make sure that the storm 

braces are attached to the apex log 
from above and to the middle of the 
first full-length wall log from below. If 
necessary, shorten the upper ends of 
the slats.  

Do not turn the screws tightly so wood 
can further swell or diminish.  

With the house having settled, you 
should adjust the attachments so the 
wall logs can settle.  

 

 

Installation of storm braces: 

 

 

General advice: 

Problem:  

Gaps appear between the wall logs  

Cause:   

Additional details are attached to the house that do not allow wood to    

  swell/diminish. 
Solutions:  

If the door/window is attached to the wall logs with screws/nails, remove these 
screws/nails; 

If the storm brace is screwed on too tightly, loosen its attachment;  
If (rain water) pipes are installed on the wall, loosen their attachments;  

  

Problem:  

The doors and windows become stuck. 

Cause:   

The house/foundation has settled. 

Solution: 

Check whether the house is level. Level the foundation joists and walls. 

Cause: 

The doors and windows have swelled due to moisture.  

Solution:  

Adjust the door and window hinges; if necessary, plane the door or window narrower. 

 

 

 

 

 

We wish you total success with the garden house installation and 
much joy with this house for many years to come! 

10/49

www.simplylogcabins.co.uk

Summary of Contents for Devon FRB44-3535

Page 1: ...Gudrum Devon...

Page 2: ...montaggio la completezza della fornitura in base alla distinta dei pezzi Tale verifica deve essere effettuata entro 14 giorni dalla consegna Eventuali diritti di garanzia si limitano alla sostituzione...

Page 3: ...o Reservado el derecho a modificaciones t cnicas Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Log cabin FRB44 3535 Blockhaus Maisonnette en pout...

Page 4: ...eview complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already painted processed with a woo...

Page 5: ...egnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather p...

Page 6: ...e that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs Cast c...

Page 7: ...ays assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans see Tec...

Page 8: ...reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame with the...

Page 9: ...placing the roof boards with the longest board from the bottom Put the groove side downwards that the bottom side of the board will meet the ends of the rafters It is recommended to place the roof bo...

Page 10: ...nishing ADVICE Make sure that the storm braces are attached to the apex log from above and to the middle of the first full length wall log from below If necessary shorten the upper ends of the slats D...

Page 11: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 12: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 13: ...42 49 w w w s i m p l y l o g c a b i n s c o u k...

Page 14: ...43 49 w w w s i m p l y l o g c a b i n s c o u k...

Page 15: ...44 49 w w w s i m p l y l o g c a b i n s c o u k...

Page 16: ...45 49 w w w s i m p l y l o g c a b i n s c o u k...

Page 17: ...46 49 w w w s i m p l y l o g c a b i n s c o u k...

Page 18: ...47 49 w w w s i m p l y l o g c a b i n s c o u k...

Page 19: ...48 49 w w w s i m p l y l o g c a b i n s c o u k...

Page 20: ...49 49 w w w s i m p l y l o g c a b i n s c o u k...

Page 21: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 22: ...w w w s i m p l y l o g c a b i n s c o u k...

Reviews: