• Check hydraulic lines for air pockets and kinks
ü
û
If the machine downtime is longer than four weeks, carry out the following
jobs:
• Prelubricate guideways and racks
• Checking the lubrication system
If the machine downtime is longer than one year, carry out the following
tasks:
• Rinse the lubrication lines with fresh lubricant
• Replace the cartridge
• Check the gaskets and replace if necessary
Decommissioning, storage
OPERATING MANUAL Automatic lubrication system
FlexxPump 404DLS