![Guardian Fall Protection SSMR G-Rail Base Instruction Manual Download Page 4](http://html1.mh-extra.com/html/guardian-fall-protection/ssmr-g-rail-base/ssmr-g-rail-base_instruction-manual_2277106004.webp)
G
ua
rd
ia
n
Fa
ll
Pr
ot
ec
tio
n
6
30
5
S.
2
31
st
S
t.
, K
en
t,
W
A
9
80
32
p
ho
ne
: (
80
0)
4
66
-6
38
5
f
ax
: (
80
0)
6
70
-7
89
2
w
w
w
.g
ua
rd
ia
nf
al
l.c
om
3
Maintenance, Cleaning, and Storage
If SSMR G-Rail Base fails inspection in any way, immediately remove it from service, and contact Guardian to
inquire about its return or repair.
Cleaning after use is important for maintaining the safety and longevity of SSMR G-Rail Base. Remove all
dirt, corrosives, and contaminants from SSMR G-Rail Base before and after each use. If SSMR G-Rail Base
cannot be cleaned with plain water, use mild soap and water, then rinse and wipe dry. NEVER clean SSMR
G-Rail Base with corrosive substances.
When not in use, store equipment where it will not be affected by heat, light, excessive moisture, chemicals,
or other degrading elements.
Prior to EACH use, inspect SSMR G-Rail Base for deficiencies, including, but not limited to, corrosion,
deformation, pits, burrs, rough surfaces, sharp edges, cracking, rust, paint buildup, excessive heating,
alteration, and missing or illegible labels. IMMEDIATELY remove SSMR G-Rail Base from service if defects or
damage are found. Ensure that applicable work area is free of all damage, including, but not limited to, debris,
rot, rust, decay, cracking, and hazardous materials.
At least every 12 months, a Competent Person other than the user must inspect SSMR G-Rail Base.
Competent Person inspections MUST be recorded in inspection log in instruction manual. The
Competent Person must sign their initials in the box corresponding to the month and year the
inspection took place.
During inspection, consider all applications and hazards SSMR G-Rail Base has been subjected to.
Inspection
3. Install SSMR G-Rail Base onto roof. Place all clamps over roof
seams, then insert (2) provided set screws in bottom holes of
each clamp.
- All set screws must face same direction. Ensure all set screws
will compress against roof seam when fully installed.
- Use 3/16” Allen wrench attachment with compatible ¼” drive
screw gun to install set screws.
- If roof is 22 gauge or thicker, torque all set screws to between
13.33-15 foot-pounds. If roof is thinner than 22 gauge, torque
all set screws to between 10.83-12.5 foot-pounds.
4. Install all G-Rails into Guardrail Knuckles.
On each clamp,
(2) set screws
must compress
against roof seam
NEVER over-torque set-screws; doing so could strip hardware or damage roof panels.
!
WARNING