background image

DRAWING

(5)  Center soft Handle 

(1) Valve Cap

(8)   D Ring

(1)   D-Ring

(2)   Soft  Handle (not for RS12.6)

(4)  EVA Foam

(9)  Fixed Skeg

(10)   Detachable Skeg

 

(6)  H3 Valve 

(3)  Bungee Cord

Any use of an air compressor may result in poor performance or damage to the board, and automatically voids all
warranties. If you leave your board exposed to the hot sun, check the pressure and deflate it slightly. Otherwise the
board may become over inflated and stretch the material. The ambient temperature affects the tube’s internal
pressure : a variation of 1°C/ 1.8°F causes a variation of the pressure in the tube of +/- 4 mBar (0.06psi)

2. Max. air pressure : 

the correct pressure for this item is for the board valve :

Minimum 0,5 bar / 7,5 psi (= 500 mBar)                                                                      
Maximum 1 bar / 15 psi (= 1000 mBar)
Do not exceed it.

3. The inflation procedure and sequence : please see drawing to the right:

1. Board valve - please see drawing to the right:
    Unscrew the valve cap(1). Push button(2) in and turn approximately 90 degrees so
    it is in the “OUT” position. Insert the pump hose end piece and inflate it until you
    will reach the required pressure. After inflation tighten all the valve caps 
    (clockwise). Only the valve(s) cap can ensure final AIR TIGHTNESS. To release 
    air from the side tubes and bottom floor tube, remove the valve cap(1) and push 
    button(2) in and turn approximately 90 degrees so it is in the “IN” position.

(3) Valve Base

(7)  Soft  Handle (not for RS12.6)

ASSEMBLY INSTRUCTIONS / INFLATION / DEFLATION

Inflate your board with a pump from BY GTSports GmbH or any pump designed for inflatable boats, and other low pressure inflatables.
These types of pump will have a hose and adapters to fit the valves on this board. Choose a smooth and clean surface to unfold your
board.

(2) Button

Seite 2

Reviews: