Page 157
Issue 08/2013
Commissioning
13 Commissioning
The start-up of the system and the inspection of the correct function must be
confirmed by the responsible person by filling out this commissioning report
in full
Installed system
Rated power (8, 13, 17, 20, 25 or 30 kW)
kW
Construction
type
One Unit
External Unit
ID number generator
Serial number of the generator
Assembly SK
Serial number switch box
Installed
magnetic plate
Manufacturer
Type
Rated current
A
Nominal voltage
V
Permissible cyclic
duration factor
%
MMI version
Standard version
Stand-Alone
Radio modem
Customer-specific
version
(description, number)
Voltage supply
MMI
System-specific power supply via generator
For external power supply only:
Voltage source:
Activated by:
fuse data
Installation site of fuse
Customer data
Excavator type:
Customer / user
Commissioning
carried out and
check the correct
function
Date:
Company / Name: