Sy
nch
ro
no
us g
en
er
at
or
s o
f s
er
ie
s D
G
G
, D
W
G a
nd W
G
Issue 05/2013
Page 86
Operation
Generator operation
7.6
Generator operation
Danger
Risk of accident and injury
y
There are risks associated with working with power
generation systems and electrical equipment.
►
Before putting the generator into operation: read through
all sections of this chapter carefully, in particular, the safety
instructions in the chapter on “General safety information”.
Ö
General safety instructions, operation, page 76
Check the correct function of the insulation monitor every day before
starting work. Only put the generator into service when the check has
showed that the insulation monitor was in correct working order.
7.6.1
Control elements in the optional switch box
The attached switch box of the generator and insulation monitor and
Operating hours counter are optional.
Line circuit breaker block
(protection: 3P + N)
Insulation monitor with switches
and signal lamps (optional)
Operating hours
counter (optional)
400 V power socket
3 230 V power sockets
Fig. 27 Operating and control elements in the switch box (optional)
Summary of Contents for BG 132
Page 118: ...page 118...
Page 119: ...page 119...
Page 120: ...page 120...
Page 121: ...page 121...
Page 123: ...Page 123 Issue 05 2013...
Page 126: ...Synchronous generators of series DGG DWG and WG Issue 05 2013 Page 126...
Page 127: ...Page 127 Issue 05 2013...