Sy
nch
ro
no
us g
en
er
at
or
s o
f s
er
ie
s D
G
G
, D
W
G a
nd W
G
Issue 05/2013
Page 58
Installation of generator
Installation of dual-bearing generators (BG 132)
Assembly
>
Apply Loctite to the screw thread and place a toothed washer
[4b]
underneath the screw head.
>
Place toothed washers
[2b]
underneath the nuts.
>
Place the flange
[1]
onto the generator and secure with four screws
[4a]
and nuts
[3a]
to a tightening torque of 47 Nm.
>
Place the collar
[2]
and clamp securely with two screws.
>
Mount the coupling plate
[5]
on the shaft at the generator and prevent
it from twisting on the shaft with a key. Follow the manufacturer's
instructions when assembling the coupling plate.
>
Secure the drive side of the coupling
[6]
to the drive and insert it into the
coupling plate. If necessary, while inserting, twist slightly until the gearing
locks. Follow the coupling and motor manufacturer's instructions when
assembling the coupling plate.
>
Secure the flange
[1]
to the drive unit. When carrying out the attachment,
follow the instructions of the motor manufacturer.
1
2
3b
3a
4x
4x
4a
4b
5
6
4a
M10 x 40 DIN 912
4b
SKS 10
3a
M10 DIN 985
3b
A10 DIN 125
Fig. 17 Assembly of flange mount
(dual-bearing, BG 132 model with standard bearing plate)
Summary of Contents for BG 132
Page 118: ...page 118...
Page 119: ...page 119...
Page 120: ...page 120...
Page 121: ...page 121...
Page 123: ...Page 123 Issue 05 2013...
Page 126: ...Synchronous generators of series DGG DWG and WG Issue 05 2013 Page 126...
Page 127: ...Page 127 Issue 05 2013...