GSWeb Playground Equipment SPACE CRAFT Installation Manual Download Page 19

GSWeb Playground Equipment 

E-mail) [email protected] 

Website) www.gsweb21.com 

Tel) +82 (0)55 326 9025 

Fax) +82 (0)55 326 9026 

65, Saengnim-daero 259beon-gil, Saengnim-Myeon 

Gimhae-si, Gyeongsangnam-do, Republic of Korea 

SPACE CRAFT 

MODEL NO. 

Rev_0 

2015.05 

GS-SC2200 

19 

Maintenance 

A. General safety measures

 

On the playground there should be a sign(pictogram) giving the following information: 

 

a) general emergency telephone number; 

b) telephone number to contact maintenance personnel; 

c) name of the playground; 

d) address of playground; and 

e) other relevant local information, if applicable. 

 

The entry, exit and emergency paths to and from a playground, intended for use by the public and emergency services, should be accessible 

and free of obstacles at all times. 

 

NOTE  Attention is drawn to local regulations. 

 

B. Procedures

 

Defects that occur during operation and which put safety at risk should be corrected without delay. If this is not possible, the equipment 

should be secured against use e.g. by immobilization or removal. 

There should be written operational procedures covering the measures to be taken in the event of accidents, fire and the like. 

Until unsafe equipment is repaired and released for use, access by the public should be prevented. Information about accidents brought to 

the attention of the manager should be recorded on a form that includes the following details: 

 

a) date and tie of accident; 

b) age and sex of victim and clothing worn, Including footwear; 

c) equipment involved; 

d) number of children on site at the time of the accident; 

e) description of accident; 

f) injury sustained including part(s) of body affected; 

g) action taken; 

h) witness statements; 

i) any subsequent equipment modification; 

j) weather conditions; and 

k) any other relevant information. 

Summary of Contents for SPACE CRAFT

Page 1: ...s 1 Removing the reticulated system Check of removing condition each rope Screwing the turn buckle and conversion the turnbuckle in anchors plate see for this workstep turnbuckle assembly 2 Abrasion c...

Page 2: ...m Completed Net Features The series is the 21st Century merry go round Our special bearing system controls the rotation speed so that the children can safely enjoy the same exhilarating experience as...

Page 3: ...ne Fall Height and safety area Safety area The requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 CSA Z614 The use zone for stationary play equipment shall extend no l...

Page 4: ...gsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2200 1 525 3 190 1 370 1 220 1 990 100 F L 4 Foundation Information Foundation Measure location and dig a hole 1525mm x 1525mm x 1...

Page 5: ...05 GS SC2200 F L 5 Overall Assembly No 22 Angle Brace No 3 Head No 2 Inner Post No 21 Galvanised Base No 110 Eye Bolt No 1 Outer Post Stand Up the Post Overall Assembly 1 Lift the assembly and place t...

Page 6: ...daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2200 6 Wooden support frame Base Assembly No 22 Angle Brace No 101 M12 x 35 Bolt...

Page 7: ...ae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2200 7 Net and Ring Assembly No 4 Arm No A Net No B Hanger Rope No 5 Upper Ring 1 Thread the net around post 2 Insert 4...

Page 8: ...aengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2200 8 Arm Head Assembly No 111 Hex Bolt Set No 114 M10 x L30 Bolt Set No...

Page 9: ...326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2200 No 115 Fix Bolt and Nut No 63 Nylon...

Page 10: ...il Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2200 Overall assembly 10 No 62 Head Cap No 6 Lower Half Ring No 41 Deck Assembly order 1 Lower Ri...

Page 11: ...on Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2200 11 Attaching Cap to Post 16 sockets on the top No 6 Lower half Ring Attach the two lower half rings with th...

Page 12: ...eon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2200 12 Deck Assembly No 41 Deck No 104 M10 X L100 Bolt Set No 106 M12 x L35 Bolt Set No 42...

Page 13: ...82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2200 13 No 41 1 Deck Cover No 108 M8 x L20 Bolt Set N...

Page 14: ...6 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2200 14 Head Cap assembly No 113 M10 x l25...

Page 15: ...p 63 Nylon Joint 101 M12 x L35 Bolt Set 102 M12 x L25 Round Headed Bolt Set 103 M10 x L25 Round Headed Bolt Set 104 M10 x L100 Round Headed Bolt Set 105 M12 x L45 Bolt Set 106 M12 x L35 Bolt Set 107 M...

Page 16: ...Nylon Joint 101 M12 x L35 Bolt Set 102 M12 x L25 Round Headed Bolt Set 103 M10 x L25 Round Headed Bolt Set 104 M10 x L100 Round Headed Bolt Set 105 M12 x L45 Bolt Set 106 M12 x L35 Bolt Set 107 M8 x L...

Page 17: ...int 101 M12 x L35 Bolt Set 102 M12 x L25 Round Headed Bolt Set 103 M10 x L25 Round Headed Bolt Set 104 M10 x L100 Round Headed Bolt Set 105 M12 x L45 Bolt Set 106 M12 x L35 Bolt Set 107 M8 x L35 Bolt...

Page 18: ...se Half Collar 41 Deck 41 1 Deck Cover 42 Deck Holder 61 L Angle 62 Head Cap 63 Nylon Joint 101 M12 x L35 Bolt Set 102 M12 x L25 Round Headed Bolt Set 103 M10 x L25 Round Headed Bolt Set 104 M10 x L10...

Page 19: ...local regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against use e...

Page 20: ...asures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to signify...

Reviews: