Maintenance 

C. Routine maintenance

 

To reduce accidents, the owner or operator should ensure that an appropriate routine maintenance schedule is established, implemented and 

maintained. This should take into account local conditions and the manufacturer's instructions that can affect the necessary inspection 

frequency. The schedule should list the components to be maintained and should also give procedures for dealing with complaints and 

breakdowns. 

The routine maintenance of playground equipment and surfaces should consist of preventative measures to maintain their level of safety, 

performance and compliance with the relevant part(s) of EN 1176. Such measures should include: 

 

a) tightening of fastenings; 

b) re-painting and re-treatment of surfaces; 

c) maintenance of any impact attenuating surfaces; 

d) lubrication of bearings; 

e) marking of equipment to signify loose fill finished surface level; 

f) cleaning; 

g) removal of broken glass and other debris or contaminants; 

h) restoring loose fills to the correct level; and 

i) maintenance of free space areas. 

 

D. Corrective maintenance 

Corrective maintenance should include measures to correct defects, or th re-establish the necessary levels of safety of the playground 

equipment and surfaces. Such measures should include: 

 

a) replacement of fastenings; 

b) welding of welding repairs; 

c) replacement of worn or defective parts; and 

d) replacement of defective structural components. 

 

E. Personal safety 

Repairs during operation that could put the safety of maintenance personnel of the public at risk, should be avoided. 

 

F. Equipment alterations 

Alterations to parts of a piece of equipment or structure that could affect the essential safety of the equipment should only be carried out 

after consultation with the manufacturer or a compete person. 

 

Summary of Contents for GS-W803

Page 1: ...1 Removing the reticulated system Check of removing condition each rope Screwing the turn buckle and conversion the turnbuckle in anchors plate see for this workstep turnbuckle assembly 2 Abrasion con...

Page 2: ...EN W 24 1 7 34 m Use zone L 24 10 7 56 m ASTM W 24 10 7 56 m Completed Net Features The series is a steel framed climbing structure made of steel loaded Nylon cables and comes protected against UV Th...

Page 3: ...one Fall Height and safety area Safety area The requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 CSA Z614 The use zone for stationary play equipment shall extend no...

Page 4: ...nim Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 1 825 1 825 3 650 1 825 1 825 3 650 700 500 4 x 4 3 4 x L200 Set Anchor B N Drill deep min150 300 FL 0 7...

Page 5: ...m Tel 82 0 55 326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 5 Post Plate Assembly Att...

Page 6: ...Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 6 Base Assembly It is strongly recommended that 3 4 workers lift the net into place Lower Pipe assembly No...

Page 7: ...x 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 7 Pipe Assembly 2 Pipe Ball connector assembly 2 N...

Page 8: ...c of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 No 63 Eyelet Shackle Set No 103 Eye Bolt Set No 61 Shackle connector 8 Attaching Net to Connector with Eyelet Shackle Middle Shackle Connector assem...

Page 9: ...9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 9 Attaching Cap to Ball Connector Attachin...

Page 10: ...commended that subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 month Refer to IPEMA...

Page 11: ...t 1 Ball Connector 1 2 Ball Connector 2 3 Ball Connector 3 4 Pipe S 5 Pipe L 21 Post Plate 41 Set Anchor 61 Shackle Connector 62 Ball Connector Cap 63 Eyelet Shackle Set 101 M22 Bolt set 102 RH Bolt S...

Page 12: ...ocal regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against use e g...

Page 13: ...ures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to signify l...

Reviews: