Safety Checklist after first assembly 

 

● 

Test intervals of  Safety: 6 months

 

● 

Test Component and contents:

 

1. Removing the reticulated system: 

- Check of removing condition each rope 

- Screwing the turn buckle and conversion the turnbuckle 

  in anchors plate(see for this workstep turnbuckle assembly) 

2. Abrasion condition of rope: 

- Checking of all rope surface 

- Strengthened of rope: Coating on the surface 

3. Attachment condition of the anchors plate and turnbuckle 

4. Screwing condition of all bolt 

5. Galvanizing condition of  the steel component: 

- Protection of steel component from corrosion.

 

 

● Measure

 

In case of the appearance the defect detail is  

repaired usually within 3 days after checking. 

 

 

Summary of Contents for GS-W803

Page 1: ...1 Removing the reticulated system Check of removing condition each rope Screwing the turn buckle and conversion the turnbuckle in anchors plate see for this workstep turnbuckle assembly 2 Abrasion con...

Page 2: ...EN W 24 1 7 34 m Use zone L 24 10 7 56 m ASTM W 24 10 7 56 m Completed Net Features The series is a steel framed climbing structure made of steel loaded Nylon cables and comes protected against UV Th...

Page 3: ...one Fall Height and safety area Safety area The requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 CSA Z614 The use zone for stationary play equipment shall extend no...

Page 4: ...nim Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 1 825 1 825 3 650 1 825 1 825 3 650 700 500 4 x 4 3 4 x L200 Set Anchor B N Drill deep min150 300 FL 0 7...

Page 5: ...m Tel 82 0 55 326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 5 Post Plate Assembly Att...

Page 6: ...Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 6 Base Assembly It is strongly recommended that 3 4 workers lift the net into place Lower Pipe assembly No...

Page 7: ...x 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 7 Pipe Assembly 2 Pipe Ball connector assembly 2 N...

Page 8: ...c of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 No 63 Eyelet Shackle Set No 103 Eye Bolt Set No 61 Shackle connector 8 Attaching Net to Connector with Eyelet Shackle Middle Shackle Connector assem...

Page 9: ...9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 9 Attaching Cap to Ball Connector Attachin...

Page 10: ...commended that subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 month Refer to IPEMA...

Page 11: ...t 1 Ball Connector 1 2 Ball Connector 2 3 Ball Connector 3 4 Pipe S 5 Pipe L 21 Post Plate 41 Set Anchor 61 Shackle Connector 62 Ball Connector Cap 63 Eyelet Shackle Set 101 M22 Bolt set 102 RH Bolt S...

Page 12: ...ocal regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against use e g...

Page 13: ...ures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to signify l...