Maintenance 

C. Routine maintenance

 

To reduce accidents, the owner or operator should ensure that an appropriate routine maintenance schedule is established, implemented and 

maintained. This should take into account local conditions and the manufacturer's instructions that can affect the necessary inspection 

frequency. The schedule should list the components to be maintained and should also give procedures for dealing with complaints and 

breakdowns. 

The routine maintenance of playground equipment and surfaces should consist of preventative measures to maintain their level of safety, 

performance and compliance with the relevant part(s) of EN 1176. Such measures should include: 

 

a) tightening of fastenings; 

b) re-painting and re-treatment of surfaces; 

c) maintenance of any impact attenuating surfaces; 

d) lubrication of bearings; 

e) marking of equipment to signify loose fill finished surface level; 

f) cleaning; 

g) removal of broken glass and other debris or contaminants; 

h) restoring loose fills to the correct level; and 

i) maintenance of free space areas. 

 

D. Corrective maintenance 

Corrective maintenance should include measures to correct defects, or th re-establish the necessary levels of safety of the playground 

equipment and surfaces. Such measures should include: 

 

a) replacement of fastenings; 

b) welding of welding repairs; 

c) replacement of worn or defective parts; and 

d) replacement of defective structural components. 

 

E. Personal safety 

Repairs during operation that could put the safety of maintenance personnel of the public at risk, should be avoided. 

 

F. Equipment alterations 

Alterations to parts of a piece of equipment or structure that could affect the essential safety of the equipment should only be carried out 

after consultation with the manufacturer or a compete person. 

 

Summary of Contents for GS-SC2101

Page 1: ...s 1 Removing the reticulated system Check of removing condition each rope Screwing the turn buckle and conversion the turnbuckle in anchors plate see for this workstep turnbuckle assembly 2 Abrasion c...

Page 2: ...to the future with a space age look Children love the flying saucer design that helps their imaginations fly into orbit Our special bearing system controls the rotation speed so that the children can...

Page 3: ...ODEL NO Rev_0 2015 05 GS SC2101 1 525 1 370 1 220 100 2 000 EN 1 830 ASTM 5 660 F L 1 450 2 250 F L 3 Safety area and Fall Height zone Fall Height and safety area Safety area The requirements for spac...

Page 4: ...eongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 1 525 1 370 1 220 100 F L 2 250 4 Foundation Information Foundation Measure location and dig a hole 1525mm x 1525mm x 1370...

Page 5: ...PACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 5 No 22 Angle Brace No 2 Inner Post No 21 Galvanized Base No A Net Overall Assembly Assemble the parts in the following order 1 Place nylon bearing on galva...

Page 6: ...05 GS SC2101 60 54 6 Post installation NYLON STRING EYE BOLT 7 Screw the eye bolt to the top of the galvanized post 8 Lift the assembly and place in the hole inserting the post into the pre assembled...

Page 7: ...daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 7 Wooden support frame Base Assembly No 22 Angle Brace No 101 M12 x 35 Bolt...

Page 8: ...on gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 8 Half Ring Assembly Assemble the two half ring at the net with the nylon joint Align th...

Page 9: ...beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 9 Deck Assembly No 41 Deck No 104 M10 X L100 Bolt Set No 106 M12 x L35 Bolt Set No 42...

Page 10: ...82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 10 No 41 1 Deck Cover No 108 M8 x L20 Bolt Set N...

Page 11: ...daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 11 Net and Cap Assembly No A Net No 6 Half RING Assemble net in the attach w...

Page 12: ...e Half Collar 41 Deck 41 1 Deck Cover 42 Deck Holder 61 L Angle 62 Post Cap 63 Nylon Joint 101 M12 x L35 Bolt Set 104 M10 x L100 RH Bolt Set 105 M12 x L45 Bolt Set 106 M12 x L35 Bolt Set 107 M8 x L35...

Page 13: ...Set No 105 M12 x L45 Bolt Set With L angle No 6 Half Ring No 41 Deck No 105 M12 x L45 Bolt Set With L angle No 112 Fix Bolt and Nut No 63 Nylon Joint Parts check list A Net 1 Outer Post 2 Inner post 6...

Page 14: ...No 108 M8 x L20 Bolt Set No 61 L Angle No 107 M8 x L35 Bolt Set Parts check list A Net 1 Outer Post 2 Inner post 6 Half Ring 21 Galvanized Base 22 Angle Brace 23 Base Half Collar 41 Deck 41 1 Deck Co...

Page 15: ...local regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against use e...

Page 16: ...asures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to signify...