GSWeb Playground Equipment GS-PD8003 Installation Manual Download Page 1

GSWeb Playground Equipment

E-mail) [email protected]

Website) www.gsweb21.com

Tel) +82 (0)55 326 9025

Fax) +82 (0)55 326 9026

65, Saengnim-daero 259beon-gil, Saengnim-Myeon

Gimhae-si, Gyeongsangnam-do, Republic of Korea

PLAY DOME

MODEL NO.

Rev_1

2017.11

GS-PD8003

1

INSTALLATION MANUAL

Safety Checklist after first assembly

Test intervals of  Safety: 6 months

Test Component and contents:

1. Removing the reticulated system:

- Check of removing condition each rope

- Screwing the turn buckle and conversion the turnbuckle

in anchors plate(see for this work step turnbuckle assembly)

2. Abrasion condition of rope:

- Checking of all rope surface

- Strengthened of rope: Coating on the surface

3. Attachment condition of the anchors plate and turnbuckle

4. Screwing condition of all bolt

5. Galvanizing condition of  the steel component:

- Protection of steel component from corrosion.

Measure

In case of the appearance the defect detail is 

repaired usually within 3 days after checking.

Caution!!

You have to construct foundation same level.

You have to keep foundation certain distance.

Summary of Contents for GS-PD8003

Page 1: ...ing condition each rope Screwing the turn buckle and conversion the turnbuckle in anchors plate see for this work step turnbuckle assembly 2 Abrasion condition of rope Checking of all rope surface Str...

Page 2: ...0m Use zone L 11 5 m ASTM EN W 11 5 m Completed Net Features The series is a steel framed climbing structure made of steel loaded Nylon cables and comes protected against UV The GS PD8003 features GS...

Page 3: ...BS EN 1176 1 ASTM F1487 CSA Z614 The use zone for stationary play equipment shall extend no less than 72 in 1830mm from all sides of the play structure Fall Height 1 855mm from surface The Fall heigh...

Page 4: ...5 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea PLAY DOME MODEL NO Rev_1 2017 11 GS PD8003 4 Foundation layout Attach Frame plate to footing Founda...

Page 5: ...LAY DOME MODEL NO Rev_1 2017 11 GS PD8003 CON C 300 1000 CON C 2 x 2 3 8 x L125 Set Anchor POST PLATE 500 800 800 800 CON C 4 x 6 5 8 x L200 SET ANCHOR 1000 300 FRONT VIEW PLAN FRONT VIEW PLAN 300 300...

Page 6: ...ea PLAY DOME MODEL NO Rev_1 2017 11 GS PD8003 6 Overall Assembly Overall Assembly Assemble the parts in the following order 1 Check number of the parts and locations as next drawing Post s location is...

Page 7: ...gsangnam do Republic of Korea PLAY DOME MODEL NO Rev_1 2017 11 GS PD8003 7 Overall Assembly Pipe Lower part GALVANIZED STEEL PAINTED POST Frame Assembly Assemble the parts in the following order 1 Scr...

Page 8: ...yeon Gimhae si Gyeongsangnam do Republic of Korea PLAY DOME MODEL NO Rev_1 2017 11 GS PD8003 8 Overall Assembly Net Assembly Assemble the parts in the following order 1 Check the stair net s location...

Page 9: ...5 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea PLAY DOME MODEL NO Rev_1 2017 11 GS PD8003 9 BOLT EYE BOLT POST Assemble GSWeb clamp in the attach with stainle...

Page 10: ...im daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea PLAY DOME MODEL NO Rev_1 2017 11 GS PD8003 10 No 103 Bolt for Clamp x 2 No 62 GSWeb Clamp POST No 105 M10 x L35 No 106...

Page 11: ...ecommended that subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 month Refer to IPEMA...

Page 12: ...local regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against use e...

Page 13: ...sures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to signify...