background image

GSWeb Recreation Equipment

E-mail) [email protected]

Website) www.gswebplay.com

Tel) +82 (0)55 326 9025

Fax) +82 (0)55 326 9026

65, Saengnim-daero 259beon-gil, Saengnim-Myeon

Gimhae-si, Gyeongsangnam-do, Republic of Korea

The Whale

MODEL NO.

GS-N101

Rev_0

2018.04

13

Overall Assembly

Assemble the parts in the following order: 

1.

Check the net’s name. 

2. Attach the net to the proper location of pipe in 

order as below picture. 

No. 61

Swing Seat

No. M1

No. M3

No. M2

No. 21-1

Cross type plate

No. 109 

Bolt set

No. 21

Plate 1

No. 43

Set Anchor

Summary of Contents for GS-N101

Page 1: ...ears Capacity 73 children Size L13 74m x W8 75m x H6 08m Use zone L16 80 x W11 94 Completed Model Features The Whale features GS Web Technology which includes the highest steel content and the stronge...

Page 2: ...a Safety area The requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 CSA Z614 The use zone for stationary play equipment shall extend no less than 72 in 1830mm from al...

Page 3: ...3 Foundation Information Attention Please refer to following details for foundation work Base plates are welded to the Whale pipe After assembling pipes and nets fix the structure on the concrete Foun...

Page 4: ...ae si Gyeongsangnam do Republic of Korea The Whale MODEL NO GS N101 Rev_0 2018 04 250 300 SAND 1 x 22 1 2 x 100L SET ANCHOR CONCRETE 3840 3189 3840 3614 15 0 30 0 F2 300 500 SAND 7 x 4 1 2 x 125L SET...

Page 5: ...ea The Whale MODEL NO GS N101 Rev_0 2018 04 300 500 SAND CONCRETE 139 8 1300 450 450 1 x 8 3 4 x 250L SET ANCHOR 1 x 8 1 2 x L100 Set Anchor 1050 300 500 SAND CONCRETE 1000 600 139 8 165 2 300 250 300...

Page 6: ...Gyeongsangnam do Republic of Korea The Whale MODEL NO GS N101 Rev_0 2018 04 F7 300 350 SAND 3 x 2 1 2 x 125L SET ANCHOR CONCRETE 60 5 500 500 250 100 600 700 360 350 300 500 SAND CONCRETE 1 3 9 8 F8...

Page 7: ...usion Divide all parts into groups Outside and Inside as below Attention It is very important to keep the stickers attached on the parts on until the installation is completed If the stickers are deta...

Page 8: ...Republic of Korea The Whale MODEL NO GS N101 Rev_0 2018 04 8 OVERALL ASSEMBLY PIPE Overall Assembly Assemble the pipes in alphabetical order 1 Check the pipes numbers on Stickers on them 2 As below p...

Page 9: ...gsangnam do Republic of Korea The Whale MODEL NO GS N101 Rev_0 2018 04 9 OVERALL ASSEMBLY PIPE Overall Assembly 1 Insert the post into Rolling hills pipe and assemble 2 Check the location 3 Fix the po...

Page 10: ...9beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea The Whale MODEL NO GS N101 Rev_0 2018 04 10 Overall Assembly FRAME Assemble the parts in the following order 1 Check names of the...

Page 11: ...do Republic of Korea The Whale MODEL NO GS N101 Rev_0 2018 04 11 OVERALL ASSEMBLY NET Overall Assembly NET Assemble the parts in the following order 1 Check the net s name There are 4 set net from Ne...

Page 12: ...259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea The Whale MODEL NO GS N101 Rev_0 2018 04 12 OVERALL ASSEMBLY DISK Overall Assembly Assemble the parts in the following order 1...

Page 13: ...Myeon Gimhae si Gyeongsangnam do Republic of Korea The Whale MODEL NO GS N101 Rev_0 2018 04 13 Overall Assembly Assemble the parts in the following order 1 Check the net s name 2 Attach the net to th...

Page 14: ...angnam do Republic of Korea The Whale MODEL NO GS N101 Rev_0 2018 04 14 OVERALL ASSEMBLY Overall Assembly Assemble the parts in the following order 1 Check the panel s name 2 Attach the net to the pro...

Page 15: ...epublic of Korea The Whale MODEL NO GS N101 Rev_0 2018 04 Completed Model 15 Maintenance information Please tighten bolt set properly If tightened too tightly it may cause damage It is also recommende...

Page 16: ...local regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against use e...

Page 17: ...ures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to signify l...

Reviews: