![GST I-9602LW Installation And Operation Manual Download Page 4](http://html1.mh-extra.com/html/gst/i-9602lw/i-9602lw_installation-and-operation-manual_2275619004.webp)
Page 2
Recommended Wiring:
The power cable connecting with D1 and D2 shall
be 2.5mm
2
or above flame-retardant copper-core.
Cable connecting with Z1 and Z2, V+ and V- and
K1 and K2 shall be 1.0mm
2
or above
flame-retardant copper-core.
III Installation
The detector is suitable for the installation that
cables are hidden behind it. Please pull out the
cables from the electric box through the hole on
the center of the base, then install the base onto
the electric box and then connect the cables to
corresponding terminals according to the terminal
mark and this installation and operation manual.
And finally install the detector onto the base.
Please refer to Fig. 2 for the installation method.
E-MAIL: [email protected]