- 28 -
PMDF 1000
6
f
inal
ProCedures
After installing the head-end station, upgrading accessories or installing cas-
settes it is necessary to tighten all cable connections, cable terminals and cover
screws in order to maintain compliance with current EMC regulations securely.
• Securely tighten the cable bolted connections using an
appropriate open-
ended spanner.
• Mount the front cover (see assembly instructions of the head-end station).