4. Dryer Installation
26
PNEG-1707
TM-Series Tower Dryer
Power Supply Disconnect
All dryers are equipped with a power disconnect switch in the power box to permit total power shut down
before opening the power box door, as required for inspection and service. The power disconnect switch
is located on the power box door for quick shut down. See table on electrical requirements
for sizing
the electrical service to the dryer.
Electrical Requirements
Dryer Model
Voltage
Motor
HP
Motor Full
Load Amps
Dryer Full
Load Amps
1/
Main Breaker
and Service
(Amps)
TM-1008
230V
3 Phase
Fan
40
94
141
200
Metering System
1 - DC
5
Unload Auger
3
8.4
Auxiliary (1)
10
28
460V
3 Phase
Fan
40
47
76
150
Metering System
1 - DC
5
Unload Auger
3
4.2
Auxiliary (1)
10
14
TM-1010
230V
3 Phase
Fan
50
118
165
300
Metering System
1 - DC
5
Unload Auger
3
8.4
Auxiliary (1)
10
28
460V
3 Phase
Fan
50
59
88
200
Metering System
1 - DC
5
Unload Auger
3
4.2
Auxiliary (1)
10
14
TM-1012
230V
3 Phase
Fan
60
140
187
300
Metering System
1 - DC
5
Unload Auger
3
8.4
Auxiliary (1)
10
28
460V
3 Phase
Fan
60
70
99
200
Metering System
1 - DC
5
Unload Auger
3
4.2
Auxiliary (1)
10
14
TM-1015
230V
3 Phase
Fan
75
172
219
400
Metering System
1 - DC
5
Unload Auger
3
8.4
Auxiliary (1)
10
28
460V
3 Phase
Fan
75
86
115
200
Metering System
1 - DC
5
Unload Auger
3
4.2
Auxiliary (1)
10
14
1/