4. Installation
PNEG-012
Vane Axial Heater
15
Bin Configuration
Figure 4E
IMPORTANT:
When mounting two (2) heaters on a bin it is imperative that they be situated as shown in
. Plenum thermostat must be to the right of master heater and master heater
must be to the right of slave heater.
Transition High-Limit Installation
1. Mark location on transition one (1) foot up from the bottom (entrance collar) and centered in
the transition.
2. Drill or knock out 7/8" diameter hole on marked location.
3. Install transition high-limit using supplied self-drilling screws.
Figure 4F The transition connecting the Vane Axial Heater to the bin with the plenum sensor in place.
Summary of Contents for PNEG-012 Series
Page 27: ...PNEG 012 Vane Axial Heater 27 8 Wiring Diagrams Standard Heater Wiring...
Page 28: ...8 Wiring Diagrams 28 PNEG 012 Vane Axial Heater Standard Heater Schematic...
Page 29: ...8 Wiring Diagrams PNEG 012 Vane Axial Heater 29 Deluxe Heater...
Page 30: ...30 PNEG 012 Vane Axial Heater 9 Parts List Standard Heater Control Box Parts...
Page 34: ...9 Parts List 34 PNEG 012 Vane Axial Heater 24 26 and 28 Gas Heater Parts...