Installing the Power Supply
Topics Covered in this Chapter
OPTION 2: Installing the Power Supply Unit
OPTION 3: Installing the Fan Control Module
NOTE
There are three options for supplying power to your system. Based on the components ordered for your
system, you must follow the instructions for OPTION 1 OR 2 OR 3 below.
OPTION 1: Solar Powered
This power supply option requires no supplemental power to the Cable Monitoring Hub. The battery and
solar panel that are included in the Hub assembly will provide the necessary power to the system. If this
option is selected, there is no external or additional power supply required and the installer can skip to
Connecting the T/RH Cables, page 43
.
NOTE:
If using solar power, the power supply port in the Cable Monitoring Hub will not be used.
OPTION 2: Installing the Power Supply Unit
1. Attach the Power Supply Unit (20) to the bin wall (30), at an accessible height from the ground,
using the four pre-installed magnetic feet.
Figure 5-1
Attaching the Power Supply Unit to the bin wall
20
Power Supply Unit
30
Bin wall
PNEG-2347
Cable Monitoring System
29
Summary of Contents for GrainVue
Page 1: ...Cable Monitoring System Installation Manual PNEG 2347 Version 1 0 Date 11 01 21 PNEG 2347...
Page 4: ...NOTES 4 PNEG 2347 Cable Monitoring System...
Page 22: ...NOTES 22 PNEG 2347 Cable Monitoring System...
Page 28: ...NOTES 28 PNEG 2347 Cable Monitoring System...
Page 42: ...NOTES 42 PNEG 2347 Cable Monitoring System...
Page 50: ...NOTES 50 PNEG 2347 Cable Monitoring System...