![GSI Group PNEG-1276 Construction And Owners Manual Download Page 52](http://html1.mh-extra.com/html/gsi-group/pneg-1276/pneg-1276_construction-and-owners-manual_2275172052.webp)
52
PNEG-1276
Top Dry Autoflow Construction Manual 24', 30' and 36'
9. Assembly
Pulley Assembly
Position the pulley assembly to the cross angle in the middle of the center collar assembly. Use a
3/8" x 1" hex head cap bolt to fasten assembly to the cross angle. Position the pulley in the direction of the
desired winch location on the sidewall.
Figure 9A
Field drill five (5) 3/8" diameter holes as shown at left. Attach the pulley assembly with 5/16" x 3/4" bolts
with the neoprene on the inside of the bin.
Figure 9B