![GSI Group PNEG-1049 Assembly And Operation Manual Download Page 20](http://html1.mh-extra.com/html/gsi-group/pneg-1049/pneg-1049_assembly-and-operation-manual_2275205020.webp)
4. Assembly
20
PNEG-1049
10"-12" Commercial Bin Sweep Augers
12. Align the next section of flight making sure that the Dura-Edge on both flights are as continuous
as possible, the angle between both faces being greater than 90° and less than 180° and
without overlapping.
NOTE:
Overlapping the flights or having an angle between the ribbon faces be less than 90° or
greater than 180°, will result in reduced unload capacity.
13. Attach the next flight to the connecting shaft using two (2) 5/8" x 4" grade 8 hex bolts and
stover nuts.
Figure 4L Flight to Flight Via Connecting Shaft
14. Attach the matching section of back shield to the bearing stand assembly and the previous section
of back shield with two (2) 3/8" x 3" carriage bolts, flat washers and nylock nuts.
Figure 4M Shield to Shield through Bearing
Summary of Contents for PNEG-1049
Page 40: ...40 PNEG 1049 10 12 Commercial Bin Sweep Augers NOTES...
Page 42: ...8 Parts List 42 PNEG 1049 10 12 Commercial Bin Sweep Augers Motor Rods to Drive...
Page 44: ...8 Parts List 44 PNEG 1049 10 12 Commercial Bin Sweep Augers 10 12 Drive Assembly...
Page 46: ...8 Parts List 46 PNEG 1049 10 12 Commercial Bin Sweep Augers 3 1 Aluminum Enclosed Drive...
Page 54: ...54 PNEG 1049 10 12 Commercial Bin Sweep Augers NOTES...