
Page 4 of 7
PNEG-1972
Installation Guide for Allen Bradley VFD Drive
Figure 7
Drive installed with top module removed for easier view of power connections.
Connect the 3 motor wires to T1, T2 and T3.
NOTE:
Do not mistakenly connect the motor wires to the terminals labeled DC-, DC+/BR+ and/or BR-.
Doing so will destroy the drive when power is applied.
Figure 8
Control Wire Installation
Remove and discard the factory jumper from terminals 01 to 11 in the VFD drive. Remove and discard the
Green with Yellow stripe wire from terminal 4 to the ground screw.
Connect Yellow wire labeled 01 and unmarked Yellow wire to terminal 01 (STOP).
Connect Orange wire labeled 02 to terminal 02 (Start/Run FWD).
Connect Red wire labeled 03 to terminal 03 (Dir-Run REV).
Connect Yellow wire labeled 11 to terminal 11 (+24V).
Connect Purple wire labeled J4-01 to terminal 14 (ANLG GND).
Connect Purple wire labeled J4-02 to terminal 13 (0-+10V IN).
Remove jumper from J2-05 and J2-06.
Connect R1 to J2-05 and R2 to J2-06. (Optional but recommended, this will shut the dryer down if the
drive faults with a user safety message.)
Remove and discard the
green/yellow wire from the
ground terminal to terminal 4.