- 16 -
STC 160
m
ountinG
inside
a
19"
Cabinet
5
3
2
2
1
1
1
5
1
Fig. 16
• Align the studs
1
on the mounting bracket
3
with the hole matrix on the
housing so that it is flush with the front edge of the head-end station and
snap it into place.
• Screw in the 4 thread-forming countersunk screws
2
that were supplied.
• Attach the mounting bracket to the other side of the housing in the same
manner.
• Install the support elements into the 19" cabinet. The total installation height
of the head-end station is 8 HU (8 height units, approx. 356 mm).
• Fit the 4 prestole nuts into the frame of the rack system according to the
distance of the holes
5
in the mounting bracket
3
(approx. 190 mm).
• Connect the head-end station according to chapter 6 (page 18) .
• Put the head-end station onto the support elements, push it into the 19"
cabinet.
• Fasten the head-end station to the prestole nuts of the 19" cabinet using the
holes
5
in the mounting brackets
3
and appropriate screws.
To avoid too strong heating of the head-end stations it is not admissible to
mount them one upon the other without using thermic precautions (e.g. per-
manently air recirculation, ventilation, heat deflectors etc.). Minimum distance
above/below is 200 mm. If necessary fit additional fans on the base plates of
the head-end stations (see chapter 4.5, page 12).