English (GB)
7
Fig. 11
KPL: installation dimensions
Fig. 12
KWM: installation dimensions
3.3.2 Installing the anchor bolts
The anchor bolts should be installed before the
pouring of the concrete as part of the construction
work. If this was not done, then mark out and install
the anchor bolts during the installation of the column
pipe.
TM
05
53
05
35
12
-
T
M
0
5
5
30
6 3
8
1
2
T
M
0
5
5
59
6 3
812
-
TM
0
5
55
97
38
1
2
D
C
D
C
Under-floor
installation
Above-floor
installation
D
C
D
C
Under-floor
installation
Above-floor
installation