![GRUNDFOS ALLDOS 525 Operation Manual Download Page 4](http://html.mh-extra.com/html/grundfos-alldos/525/525_operation-manual_2272212004.webp)
DHV 525 en
4
15.750045-V3.0
1
General
1.1
Introduction
This operation manual contains all the information required for starting up and handling
the described pressure loading valves.
If you require further information or if any problems arise, which are not discussed in
detail in this operation manual, contact ALLDOS directly for the information needed.
1.2
Using this Paper
The headings
WARNING
,
CAUTION
and
NOTE
have the following meaning:
!
Warning
Danger of injuries and accidents!
Caution
Danger of incorrect operation or damage to the product!
Note
There is an exceptional feature.
1.3
Warranty
Warranty in accordance with our general terms of sale and delivery shall only be valid, if:
•
the product is used according to the information within this paper,
•
the product is not being opened or used improperly,
•
maintenance and repair is implemented exclusively by authorized and qualified per-
sonnel,
•
original spare parts are used for repairs.
The safety instructions specified in this document must be observed at all times!
2
Safety Instructions
The component has left the factory in a safe error-free state. In order to maintain this state
and ensure safe operation, the user most observe the instructions and warning notes
provided in this technical information.
If safe operation is no longer possible, the component must be shut down and secured
against unintentional operation. This is the case:
•
If the component is visibly damaged
•
If the component no longer seems operational
•
Following long periods of storage under unfavourable conditions
2.1
Application of the Product
The pressure loading valve described here is used to maintain the required
counterpressure for the pump, if insufficient counterpressure is available in the system or
open outflow is specified.
!
Warning
Other applications are not intended and are not permitted. ALLDOS Eichler GmbH
accept no responsibility for damages caused by unintended use.
2.2
Obligations of the Operating Authority
The operating authority of the plant is responsible for
•
instructing the operation personnel
•
arranging regular maintenance
Q-Pulse Id: VM25