background image

2

ART. NO.

PUMP CONSTRUCTION

1.  The pump is already assembled with the hose, drum cover & bucket. The user just needs to attach the lever handle with the plunger rod.

2.  Select the right handle setting for 

light, moderate or high viscosity oils. 
Attach the lever handle to connecting 
lever using the pivot pin and retainer 
clip. 

3.  Pull the plunger rod of piston sub 

assembly up. Attach the top of lever 
handle to the piston rod using the 
piivot pin and retainer clip. 

4.  Now the pump is ready for 

Priming

Start the pump by moving the lever 
handle. Priming is a process of getting 
the pump started by operating the 
pump a few times. 

Drum Cover

Pivot Pin & Retainer

 

Clip

PVC Hose

Plunger Rod

Machine Screw 
with Hex Nut

Delivery Spout

Suction Tube

Non Return Valve

Piston

Nut

Outlet Adapter

Flange

Connecting Lever

Lever Handle 
with Rubber Grip

Steel Bucket

Carry Handle

Cover Lock

ASSEMBLY & OPERATION

       NOTE:-  

• 

If there is any difficulty in Priming, put some oil in the pump outlet and keep operating the lever handle until the discharge begins.

• 

There is a machine screw and a hex nut in the flange assembly to hold the pump tube assembly firmly in place.                               
Do not over tighten the screw and nut.

For Lighter Oils with Low viscosity

For Oils with Moderate Viscosity

For Heavier Oils with High Viscosity

VARIABLE SETTING OF LEVER HANDLE 

NOTE

Pump delivers oil on moving 
Plunger Rod upwards

Reviews: