background image

COLD FRAMES

2

Revision date: 02.12.09

YOU MUST READ THIS DOCUMENT BEFORE YOU  

BEGIN TO ASSEMBLE THE SHELTER

.

Thank you for purchasing this GrowSpan™ Cold Frame. 

When properly assembled and maintained, this product will 

provide years of reliable service. These instructions include 

helpful hints and important information needed to safely 

assemble and properly maintain the cold frame. Please 

read these instructions 

before

 you begin.

If you have any questions during the assembly, contact 

Customer Service for assistance. 

SAFETY PRECAUTIONS

•  Wear eye protection.
•  Wear head protection.
•  Wear gloves when handling metal parts.
•  Use a portable GFCI (Ground Fault Circuit Interrupter) 

when working with power tools and cords.

•  Do not climb on the frame during or after construction.
•  Do not occupy the structure during high winds,  

tornadoes, or hurricanes.

•  Provide adequate ventilation if the structure is  

enclosed.

•  Do not store hazardous materials in the structure.
•  Provide proper ingress and egress to prevent  

entrapment.

ANCHORING THE FRAME 

 

Before installing a cover, the frame must be anchored to 

prevent personal injury and property damage.

Anchor kits are 

not included 

with the shipment and must be 

purchased or supplied by the customer. 

Consult the MUST READ document for anchoring 

information and suggestions. Please call Customer Service 

at 1-800-245-9881 for additional anchoring information and 

to purchase anchors for your cold frame.

LOCATION

Choosing the proper location is an important step before 

you begin to assemble the structure.  

The following suggestions and precautions will help you  

determine whether your selected location is the best  

location. 
•  Never erect the structure under power lines.
•  Identify whether underground cables and pipes are  

present 

before

 preparing the site or anchoring the    

structure.

•  Location should be away from structures that could  

cause snow to drift on or around the building.

•  Do not position the structure where large loads such as 

snow and ice, large tree branches, or other overhead 

obstacles could fall. 

SITE

After choosing a location, proper preparation of the site is 

essential. Follow the information below.
• 

A level site is required

. The site must be level to  

properly and safely erect and anchor the structure.

•  Drainage: Water draining off the structure and from  

areas surrounding the site should drain away from the  

site to prevent damage to the site, the structure, and  

contents of the structure.

WARNING:

 The individuals assembling this structure 

are responsible for designing and furnishing all  

temporary bracing, shoring and support needed during 

the assembly process. For safety reasons, those who 

are not familiar with recognized construction methods 

and techniques must seek the help of a qualified  

contractor.

Summary of Contents for 105148

Page 1: ...old Frames STK DIMENSIONS 105148 4 W x 2 9 H x 6 L 105149 4 W x 2 9 H x 8 L 105150 4 W x 2 9 H x 12 L 105151 4 W x 2 9 H x 16 L Photo may show a different but similar model 2009 GrowSpan All Rights Re...

Page 2: ...rmation and suggestions Please call Customer Service at 1 800 245 9881 for additional anchoring information and to purchase anchors for your cold frame LOCATION Choosing the proper location is an impo...

Page 3: ...ons before you begin to assemble your shelter Clip or Fabric Clip A short half section piece of conduit cut lengthwise used to secure the end panel or main cover or both to the leg or rafter assembly...

Page 4: ...ent If anything is missing or you have questions consult the Pictorial Parts Guide and all diagrams for clarification or contact Customer Service NOTE At this time you do not need to open the plastic...

Page 5: ...tos will help you identify the different parts and show you how they are used Some parts are not shown FA4482B Tek Screw Swaged Plain Swaged and Plain Rafter Sections some pieces are not shown 104543...

Page 6: ...of these instructions See illustration below to identify main parts of the cold frame 1 Locate the required parts for each assembly procedure 2 Assemble the rafters and frame 3 Attach recommended bas...

Page 7: ...accurate 90 angle 5 After squaring the position of the cold frame measure the length and drive the next corner ground post NOTE Rafter spacing is 2 on center Measure the length from the center of the...

Page 8: ...oint and the rafter positioned on a flat surface secure the joint using a single self tapping Tek screw Position Tek screws approximately 1 from pipe joint ATTENTION Install the screws so they will no...

Page 9: ...shown above use duct tape to tape any sharp edges or Tek screws that could damage the cover when installed and continue with the cover installation procedure 2 on center Customer Supplied Baseboard Ac...

Page 10: ...eenhouses do not have any tested loading criteria INSTALL THE MAIN COVER The main cover is attached to the assembled frame using fabric clips 105107 and Tek screws It is attached to the end rafter ass...

Page 11: ...11 COLD FRAMES Revision date 02 12 09 105151F 4 x 16 105150F 4 x 12 105149F 4 x 8 105148F 4 x 6 Ground Level 4 Wide Cold Frames All frames are shown with the recommended customer supplied baseboard...

Reviews: