background image

Page 1 of 4 

 

 

growerssolution.com  

931-528-3390

 

 

SUPER-DUTY GREENHOUSE INSTALLATION 

 

!!!! CAUTION: Tubing ends may be sharp!!! 

 

Read directions completely before beginning assembly.

  We recommend that you visit The Learning Center at 

www.growerslearning.com

click on How to Assemble under categories. In this section you will find video tutorials 

to assist you with the assembly of your new greenhouse.  If you have ANY questions please give us a call at  
866-928-3390.

 

 

 

Step 1 – Ground Stakes

   

 

Square the corner stakes with each other.  Take all 
measurements on the outer edge of pipe. 

 

Drive Corner stakes and then drive rest of stakes 

4 ft. 

centers

 (Fig 1.1). 

 
NOTE:

  Use a large bolt and washer,  or 2 x 4 on top of stakes  

              to drive them into the ground. 

 

 

The stakes should be approximately 24” below the 
ground.  The section above ground will be the height of 
your sidewall (Fig. 1.2) 

 

About 7 ½ ft for High side, YOU MAY NEED TO CUT DOWN.

  

 
NOTE:

  Use a string level to keep ground stakes level.

 

 

Fig 1.1 Ground Stakes

 

 

Fig 1.2 Ground Stake Depth

 

 

 

Step 2 – Bow Assembly

   

 

Place bow sections on flat ground. 

 

Slide sections together, and secure at joints with  

               self-tapping 

screws (provided). 

 

Measure up each end of bow 6” and make a reference 
mark.  The mark is how far the bow goes into the 
ground stake (Quonset Style Bow).  High Side and Low 
Side insert till they stop at a sharp bend.  Secure with 
tek screw.

  

 
NOTE:

  

Bows are 2 or 3 pieces depending on your  

             greenhouses’ size.

 

 

Fig 2.1 Bow Assembly

 

 

 

 

Reviews: