background image

Roll Up Door Instruction Pictures 

Summary of Contents for Quonset Low Sidewall

Page 1: ...se Photo s are for Reference only All Greenhouses are assembled in a similar fashion Use these Photo s as a guide along with your instruction manual If you are unsure about assembly Call Us 866 928 33...

Page 2: ...Quonset Greenhouse...

Page 3: ...Low Sidewall Greenhouse...

Page 4: ...High Sidewall Greenhouse...

Page 5: ...Figure 1 1 Taking Measurements on outer edge...

Page 6: ...Figure 1 2 Use string around all 4 corners...

Page 7: ...Figure 2 1 Lay bows flat and slide together...

Page 8: ...Figure 2 2 Secure joints with 2 Tek Screws...

Page 9: ...Figure 4 3 Connect purlin using 2 hole strap on the first and last bow...

Page 10: ...Figure 4 4 Use purlin clamps on remaining bows...

Page 11: ...Figure 5 1 Attach base board with 2 hole straps down sides Attach base board with L brackets on endwalls...

Page 12: ...Figure 5 2 Attach hip head board with 2 hole straps down sides Place a Tek screw through 2 hole strap to secure to ground stake...

Page 13: ...Figure 7 1 Attach wire base on hip head board if you have rollup sides Attach wire base to base board if you do not have rollup sides...

Page 14: ...Figure 7 2 Place a wire base between hip board and base board...

Page 15: ...Figure 7 3 Attach wire base to face of hip head board...

Page 16: ...Figure 8 1 Lay film over wire lock channel and fasten with wire lock...

Page 17: ...End Wall Instruction Pictures...

Page 18: ...Figure 2 1 For 36 Door Opening Find Center of greenhouse then measure 18 5 to the left and right...

Page 19: ...16 ft Low Sidewall End Walls...

Page 20: ...20 ft Low Sidewall End Walls...

Page 21: ...24 ft Low Sidewall End Walls...

Page 22: ...30 32 ft Low Sidewall End Walls...

Page 23: ...Figure 3 1 Drive 1 ground stakes into position based on layout...

Page 24: ...Figure 5 1 Measure distance between ground stakes and peak of bow...

Page 25: ...Figure 6 1 Insert square upright over ground stake Secure with Tek screws on inside side of upright...

Page 26: ...Figure 7 1 Attach brace bands over the bow and into the square upright...

Page 27: ...Figure 8 1 Insert bolt through brace band and secure on inside of greenhouse...

Page 28: ...Figure 9 1 Place self tapping TEK screw through brace band to secure...

Page 29: ...Figure 10 1 Install header supports at chest height...

Page 30: ...Figure 11 1 Use TEK screws to install header with L brackets...

Page 31: ...Figure 13 1 Use Door frame to seal the end film around the opening...

Page 32: ...Roll Up Side Instruction Pictures...

Page 33: ...Figure 1 1 Hip Board and Base Board...

Page 34: ...Figure 2 1 Mount 2 hole straps...

Page 35: ...Figure 3 1 Attach film to wire lock base...

Page 36: ...Figure 4 1 Slide and secure pipes with 2 Tek screws...

Page 37: ...Figure 5 1 Roll poly around pipe and secure with Snap Clamps...

Page 38: ...Figure 6 1 Fender washer to reinforce strapping...

Page 39: ...Figure 6 2 Fold ends of strapping twice...

Page 40: ...Figure 6 4 Mount on hip board and base board...

Page 41: ...Figure 6 3 Pull Strapping tight...

Page 42: ...Figure 6 5 Pipe sticks out about 1 foot on each end...

Page 43: ...Figure 7 1 Place handle on pipe and secure with 2 Tek screws...

Page 44: ...Figure 8 1 Use strapping to secure handle to the greenhouse...

Page 45: ...Roll Up Door Instruction Pictures...

Page 46: ...Figure 2 1 Attach roll up door film...

Page 47: ...Figure 3 1 Roll film up on pipe to the inside...

Page 48: ...Figure 4 1 Place one clip at each end and in the center...

Page 49: ...Figure 5 1 Assemble the swivel handle...

Page 50: ...Figure 5 2 Attach the knuckle to the door pipe...

Page 51: ...Figure 5 5 Attach extension pipe to knuckle...

Page 52: ...Figure 5 3 Slip boot onto pipe Attach Handle to extension pipe...

Page 53: ...Figure 5 4 Slip boot over the knuckle and place zip ties to hold it in place...

Page 54: ...Figure 6 1 Attach Wind Strapping to the upright on top Fold over end to reinforce and place Tek screws...

Page 55: ...Figure 6 2 Fold over end to reinforce pull tight and place Tek screws...

Page 56: ...Figure 7 1 Trim existing Greenhouse Film...

Page 57: ...Figure 8 1 Use wire lock to seal door along the sides when needed...

Page 58: ...Spin Handle Instruction Pictures...

Page 59: ...Figure 1 1 Slip small sleeve over the bolt...

Page 60: ...Figure 2 1 Slip large sleeve over small sleeve...

Page 61: ...Figure 3 1 Insert through hole attach nut and tighten...

Page 62: ...Wind Bracing Instruction Pictures...

Page 63: ...Wind Strapping Instruction Pictures...

Page 64: ...Figure 1 1 Tie strapping onto a bottle...

Page 65: ...Figure 2 1 Place strapping between hoops evenly for the size greenhouse you have IT IS NOT REQUIRED BETWEEN EVERY BOW If you wish to do this you will need to purchase additional strapping...

Page 66: ...Figure 3 1 Fold over strapping twice for strenght...

Page 67: ...Figure 3 2 Use washer and wood screws to attach...

Page 68: ...If you have questions please check out Grower s Learning FAQ section If you still need help please give us a call at 866 928 3390...

Reviews: