background image

Page 2 of 4 

 

Step 3 – Bow Installation

   

 

After bows have been assembled, raise upright and place ends in 
ground stakes (Fig 3.1) and attach with TEK screws. 

 

Fig 3.1 Bow Installation 

 

 

Step 4 – Purlins

   

 

The straight 

purlin pipe 

sections connect together with self-

tapping TEK screw.  The assembled purlin is attached to the first 
and last bow (Fig 4.1) using a 2-hole strap (Fig 4.3).  The purlin 
clamps are used on the remaining bows (Fig 4.4).  Trim extra 
pipe off.  The Dakota House has 3 runs of purlin.  One at the 
center of bow inside of the house (Fig 4.1), one on each sidewall 
at top of upright inside of the house (Fig 4.2).  Make sure to view 
illustrations. 

 

NOTE:

  The TEK screw is drilled through the 2-hole strap in Fig 4.3.  This  

              secures the end of purlin to greenhouse. 

 

Fig 4.1 Center of Bow 

 

Fig 4.2 Sidewalls 

   

 

Fig 4.3 2-Hole Strap      Fig 4.4 Purlin Clamp 

 

 

Step 5 – Base Boards

   

 

Attach 

base boards 

(2 x 6 pressure-treated recommended) on 

the bottom of the sidewall outside of house with supplied 2-hole 
pipe straps. 

 

IF you have roll-up sides you will need to install a head board 
also.  This is installed anywhere from 3 feet all the way up to the 
bend at about 6 feet on each side.  Install this with the supplied 
2-hole straps. 

 
NOTE:  

You must attach 2 hole strap to ground stake using self-tapping  

              screws also use  wood screws (not included) to attach to your  
              timber. 

 

Fig 5.1 Base Board 

 

 

Summary of Contents for DAKOTA

Page 1: ...are the corner stakes with each other Take all measurements on the outer edge of pipe Drive Corner stakes 18 inches in ground and then drive rest of stakes 4 ft centers Fig 1 1 NOTE Use a large bolt and washer or 2 x 4 on top of stakes to drive them into the ground Fig 1 1 Ground Stakes Step 2 Bow Assembly Place bow sections on flat ground Slide sections together Fig 2 1 and secure at joints with ...

Page 2: ...t inside of the house Fig 4 2 Make sure to view illustrations NOTE The TEK screw is drilled through the 2 hole strap in Fig 4 3 This secures the end of purlin to greenhouse Fig 4 1 Center of Bow Fig 4 2 Sidewalls Fig 4 3 2 Hole Strap Fig 4 4 Purlin Clamp Step 5 Base Boards Attach base boards 2 x 6 pressure treated recommended on the bottom of the sidewall outside of house with supplied 2 hole pipe...

Page 3: ...he bow Using TEK screws install header with corner braces and header tie The installation of the rear end wall is the same However header upright spacing can be adjusted to accommodate a fan or vent if you choose to install one Fig 6 1 Fig 6 2 Fig 6 3 Step 7 Wire Lock NOTE Not all houses use wire lock Some use batten tape and staples Attach the Wire Lock Channel on the top of first bow and last bo...

Page 4: ... into the channel on top of the plastic Fig 8 1 NOTE Please watch the video online for more information Fig 8 1 Wire Lock Film Installation Additional Information Concerning Weather During windy stormy winter conditions it is mandatory to roll sides down and wire lock ends Lack of doing this may result in greenhouse damage due to wind uplift If you are expecting sever snow 6 inches plus you should...

Reviews: