background image

Growatt THOR 03AS-S

Growatt THOR 07AS-S/P

Single-phase AC charger user manual

4-13/F, Building A, Sino-German (Europe) Industrial Park, 
Hangcheng Ave, Bao'an District, Shenzhen, China

SHENZHEN GROWATT NEW ENERGY CO., LTD.

T

E

W

+ 86-755-27471900
[email protected]
www.ginverter.com

Summary of Contents for THOR 03AS-S

Page 1: ...7AS S P Single phase AC charger user manual 4 13 F Building A Sino German Europe Industrial Park Hangcheng Ave Bao an District Shenzhen China SHENZHEN GROWATT NEW ENERGY CO LTD T E W 86 755 27471900 info ginverter com www ginverter com ...

Page 2: ...t also has a friendly man machine interface and versatile functions of control billing and communication The charger can be connected to a back office server to realize the functions of reservation and payment via Mobile phone APP Diversified communication options including wired Ethernet WIFI 4G is available for back office server connection We sincerely hope that this product can meet your needs...

Page 3: ...name plate 8 Waterproof cable gland for communication wire 9 Waterproof cable gland for AC input cables Wiring definition in the side window 1 Terminal block for CT meter wiring The terminal definition is 485 A 485 B is RS485 terminal for meter connection CT CT is for CT connection 2 AC input terminals Terminal definition is AC L AC N PE 3 Peak Off Peak Charging Enable signal is eSense L N 5 6 7 9...

Page 4: ... fixing III Installation and wiring 4 3 3 1 1 Open the package you ll see a charge point a mounting bracket a user manual and a bag of mounting accessories There is also an RFID card if the charge point is RFID version For cabled version a cable hooker is also included inside 3 1 Mount on a wall 3 1 2 Remove the mounting bracket from the charge point use it as a template to mark the position of th...

Page 5: ...ndow Close the side window with the cover then the wring is done 3 2 Mount on a pole 3 2 1 Open the package of the pole take out the pole and mounting accessories 3 2 2 The pole must be installed on a hard surface concrete surface is recommended it can also be mounted on a solid ground Drill hols according to the requirements marked on the illustration for fixing expansion bolts 3 2 3 Fix the pole...

Page 6: ...O in the side window Close the side window with the cover then the wring is done IV APP download register and login 4 1 APP download 7 8 4 2 Register Before using ShinePhone APP first time the user must register an account in advance There are three steps when users register the account 1 Fill in the account registration information Users can scan the QR code Android and IOS with the WeChat or go ...

Page 7: ... then the detailed location will be filled automatically of the country Manual input the user manually inputs the country city and detailed address c This page can be skipped After skipping the user registration account will be logined directly enter the APP plant page Skipping the process of adding plant the default plant will not be generated When enter the APP plant page the system will remind ...

Page 8: ...ong password you can click the eye icon on the right side of the password input box to view the password and click the password again to hide it 4 4 EV Charger Internet Configuration For new users please click the in the upper right corner of the overview select GroHome and add device EV Charger for users who already have had GroHome page go to the GroHome page directly and click the in the upper ...

Page 9: ...FI whose name is consistent with the serial number of the EV charger then enter the WiFi password default WiFi password is 12345678 and click next e Enter the WiFi name and password of your router the connected WiFi is required 2 4GHz WiFi and the network should be available and then click Next f Please wait 2 5 minutes and refresh the EV charger status to confirm whether the communication is succ...

Page 10: ...V charger has an external current sensing device then it click the advanced in the WiFi configuration page it needs to choose the corresponding configuration CT or meter type choose the right brand of the meter type Acrel or Eastron ...

Page 11: ...the EV Charger Enter the serial number of the EV charger or scan the Bar QR code to add the EV charger b Select Network Cable for network configuration c Click cancel and the network will be connected dynamically based on the dynamic IP mode d Waiting for 2 5 minutes which EV charger will refresh its status and confirm whether the communication is successful ...

Page 12: ... connect to the WiFi whose name is consistent with the series number of EV charger and enter the default password 12345678 3 Make sure the parameters of IP and getaway are the same as that of the router and click next 4 Connect the network cable and wait for 2 5 minutes which EV charger will refresh its status and confirm whether the communication is successful ...

Page 13: ...set the network or do some basic setting a Click the AP mode and enter the hotpot connection click next to switch to other pairing mode b Connect the WiFi whose name is consistent with the series number of the EV charger and click next c User can check the basic information and do some basic parameters setting like network setting sever setting and EV charger setting d After that waiting for 2 5 m...

Page 14: ...click the EV charger setting users can set the charging activation way like APP RFID plug and charge VI Operation instruction Initiate or cease charging by using APP or by swiping RFID card You can also use APP for reservations and choose the work mode you need APP RFID mode ...

Page 15: ...the side of the charger Plug Charge mode operation process flow VII EV Charger Work Modes 7 1 Fast Mode Plug Charge Click charge directly and the EV will be charged at maximum power coming from a renewable energy source or simply from the grid especially quickly if you re in a hurry and support multiple control strategies of timer charging capacity charging budget Note the reservation function onl...

Page 16: ...to work all the time Charging Capacity Reservation Users can set the target charging capacity kWh and the start time through clicking energy and also can enable every day to make it to work following that strategy to work all the time Charging Budget Reservation Users can set the target charging budget and the start time through clicking the cost and also can enable every day to make it to work fo...

Page 17: ...r self consumption rate and cut your bill Note The EV should connect with the EV charger and the PV Linkage mode will be automatically activated when the solar power is sufficient Wiring To monitor the real time power import and export a CT or meter is needed for this function to work properly If CT is used the wiring will be as below 8 3 If meter is used please wire it as below White RED 485A 485...

Page 18: ... be charged dynamically only by surplus solar power when the surplus solar power is greater than Min operation power when surplus solar power is lower than Min operation power the EV charger will use grid power to offset the shortage part and keep charging at Min operation power Note Min operation power 1 4kW for single phase EV charger and 4 1kW for three phase EV Charger Boost Function Manual Bo...

Page 19: ...V has been charged by surplus solar energy with the only 10kWh of charge accumulated because users activated the smart boost then the THOR EV Charger will automatically boost the charge to the required 20kWh by 22 00 even taking power from the grid 7 3 Off peak modes Introduction Once enable the Off Peak mode the EV charger will automatically charge the EV when it s at off peak time to reduce the ...

Page 20: ...id to guarantee the EV s battery capacity when the off peak time is not long enough 7 4 Load balancing function The EV charger can read the incoming power to the house with an additional CT Meter Then the EV charger will adjust its charging power dynamically according to the home power to avoid exceeding the limited point always charge your car at the maximum charging speed without trigger the pow...

Page 21: ...k mode setting gateway settings subnet mask DNS address EV charger setting 1 Charging rates users can set their charging fees which could be used for the calculation of electricity cost and off peak mode 2 Allow charging time user can use it to limit the time to use the EV charger 3 Maximum output current of the EV charger users can use it to limit the max power output from the EV charger 4 Breath...

Page 22: ...rt time end time charging time charging cost charging capacity and self consumption rate b Schedule record Display the list of charging schedules that have been set before 39 40 Permissions it s useful for authorization management add and authorize the other account which can use the EV Charger directly ...

Page 23: ...ltiple faults happen at the same time each sequence of blinking shows in chronological order at an interval of 3 seconds Please contact with our service engineer if the fault occurs Please see the table below for detail information No Fault code on LCD if available Number of blinks of the LED Fault description 1 100 3 The red emergency stop button is pressed or broken 2 3 4 5 6 7 8 9 10 11 12 13 1...

Page 24: ... RFID APP Standby power 8W Standard IEC 62196 2 EN61851 Mounting Wall Pole Certificate CE Protection features Over voltage 275V Under voltage 176V Over current 20A 40A Short circuit Yes Leakage protection Yes Over temperature Yes Lightning protection Type II XII Specification 43 44 XIII Annex 13 1 Electrical diagram Fig11 1 Main circuit diagram 13 2 Contact Growatt New Energy Co Ltd 4 13 F Buildin...

Reviews: