
Growatt New Energy
Australia Pty Ltd
C1, 27-29 Fariola Street,
Silverwater NSW 2128
Phone: 02 8065 1298
Email: [email protected]
Email:
[email protected]
www.ginverter.com
(4) Click
button to apply the change.
(5) Repeat to click
button to apply the change again for 3 times.
1.2.3 ShineServer change inverter 10 minutes average voltage 255v setting
Please note, this option is only valid for new version inverters installed after 9, October,
2016. Which meet the new AS4777.2:2015 standard. Old version inverters installed before
that date are not have 10 minutes average voltage 255v limitation, thus, this step is NOT
required.
Please follow the below steps to change the 10 minutes average voltage 255v setting via